Relevancy of Factors and Mitigation Measures in Controlling Time and Cost Overrun towards Malaysian Environment

Article Preview

Abstract:

Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each mitigation measures in relation with causative factors of time and cost overrun in Malaysian construction projects. A total of 56 mitigation measures were identified and correlated with the critical factors of time and cost overrun which were categorized into four phases of project life cycle. Data collection was done by conducting structured interviews amongst the experienced practitioners of the southern regions of Peninsular Malaysia.

You have full access to the following eBook

Info:

Periodical:

Pages:

1007-1011

Citation:

Online since:

July 2015

Export:

Share:

Citation:

* - Corresponding Author

[1] B. Flyvbjerg, M. K. S. Holm, S. L. Buhl, How common and how large are cost overruns in transport infrastructure projects ?, J. Transp. Rev., 23 (2003) 71–88.

DOI: 10.1080/01441640309904

Google Scholar

[2] M. Sambasivan, Y. W. Soon, Causes and effects of delays in Malaysian construction industry, Int. J. Proj. Manag., 25(2007) 517–526.

DOI: 10.1016/j.ijproman.2006.11.007

Google Scholar

[3] I. Ismail, I. A. Rahman, A. H. Memon, Study of factors causing time and cost overrun throughout life cycle of construction project, Proceedings of Malaysian Technical Universities Conference on Engineering & Technology (MUCET), 2013, 1–7.

Google Scholar

[4] I. A. Abdul Rahman, H. Berawi, M.A. Berawi, A.R. Mohamed, O. Othman, M. Yahya, Delay mitigation in the Malaysian construction industry, J. Constr. Eng. Manag., 132(2006) 125–133.

DOI: 10.1061/(asce)0733-9364(2006)132:2(125)

Google Scholar

[5] M. Olawale, Y., Sun, Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice, Constr. Manag. Econ., 28(2010) 509–526.

DOI: 10.1080/01446191003674519

Google Scholar

[6] I. Ismail, A. H. Memon, I. A. Rahman, Expert opinion on risk level for factors affecting time and cost overrun along the project lifecycle in Malaysian construction projects, Int. J. Constr. Technoogy Manag., 1(2013) 10–15.

Google Scholar