Technical Competency of Construction Manager in Malaysian Construction Industry

Article Preview

Abstract:

Primarily due to contractors’ faults, construction industries in Malaysia have been facing problems such as delays, wastages, cost overruns and others. Inability of construction manager (CM) to efficiently manage construction projects is the major contribution to projects’ failure, and the lack of terms of reference on the technical competency for CM are believed to be the major setback. This paper reports the results of a preliminary study which was carried out to identify the technical competencies of CM. Exploratory mixed research methods were selected by employing qualitative and quantitative approaches. Multi-layered thematic analysis was embedded into literature analysis to maintain reliability and then validate through structured interviews. It was found that CM requires several technical competencies including managing staff, materials, labours, plants, sub-contractors, safety, money, quality, time, environment, administration, pre-construction, closeout and handover, responsibility to other parties, computer literacy, and administration of construction contract. Hence, the technical competencies for CM are believed to be exhaustive and holistic in singling out the appropriate technical knowledge and skills, and bring about numerous advantageous towards technically competent CM.

You have full access to the following eBook

Info:

* - Corresponding Author

[1] Construction Industry Development Board Malaysia. (2012). Retrieved 6 1, 2012, from Intranet: http: /intranet. cidb. gov. my/iso_diy/consultant. nsf/cons_publish?OpenView&Start=1.

Google Scholar

[2] Ibrahim, A. R., Roy, M. H., Ahmed, Z., & Imtiaz, G. (2010). An Investigation of the Status of the Malaysian Construction Industry. Benchmarking: An International Journal , pp.294-308.

DOI: 10.1108/14635771011036357

Google Scholar

[3] Sambasivan, M., & Soon, Y. W. (2007). Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management, Vol. 25 , pp.517-526.

DOI: 10.1016/j.ijproman.2006.11.007

Google Scholar

[4] Abdul Rahman, H., Berawi, M. A., Berawi, A. R., O. Mohamed, M. O., & Yahya, I. A. (2006). Delay Mitigation in the Malaysian Construction Industry. Journal of Construction Engineering and Management, 132(2) , pp.125-133.

DOI: 10.1061/(asce)0733-9364(2006)132:2(125)

Google Scholar

[5] Jabatan Audit Negara Malaysia. (2010). Laporan Ketua Audit Negara Tahun 2010: Aktiviti Kementerian/Jabatan dan Pengurusan Syarikat Kerajaan Persekutuan. Kuala Lumpur: Jabatan Audit Negara Malaysia.

DOI: 10.17576/geo-2021-1702-14

Google Scholar

[6] Unit Penyelarasan Pelaksanaan. (2013, May 27). Pengurusan Projek Sektor Awam. Bengkel Penggubalan Modul Dan Kaedah Pelaksanaan Kursus Pensijilan Pengurusan Projek Sektor Awam . Kuala Lumpur, Malaysia: Jabatan Perdana Menteri.

DOI: 10.17576/pengurusan-2018-52-13

Google Scholar

[7] Construction Industry Development Board Malaysia (CIDB). (2011). Buletin Statistik Pembinaan Suku Tahunan 2011. Quaterly Report , pp. Suku 4, Bahagian 1.

Google Scholar

[8] Hassan, F., Maisham, M., Khan, S. M., Alwi, S. A., & Ramli, H. (2010). Competencies, Skills, and Knowledge of Quantity Surveying Graduates. The Quantity Surveying International Convention.

DOI: 10.1109/chuser.2011.6163722

Google Scholar

[9] Bakar, A. H. (2009). Construction in the Developing World: Issues on Indigenous Contractors. In A. S. Hassan, Contextual Issues of the Built Environment in Malaysia (pp.27-59). Pulau Pinang: Penerbit Universiti Sains Malaysia.

DOI: 10.21315/mjms2016.23.5.1

Google Scholar

[10] Koskela, L. (1992). Technical Report No. 72: Application of the New Production Philosophy to Construction. Stanford University: Centre for Integrated Facility Engineering.

Google Scholar

[11] National Center for Construction Education and Research (NCCER). (2008). Project Management: Annotated Instructor's Guide, 2nd Edition. New Jersey: Pearson, NCCER, Contren Learning Series.

Google Scholar

[12] Halpin, D. W. (2006). Construction Management, 3rd Ed. Hoboken, NJ: John Wiley & Sons, Inc.

Google Scholar

[13] Farooqui, R. U., & Saqib, M. (2010). Desirable Attributes and Skills for Graduating Construction Management Students. Associated Schools of Construction Proceedings, 46th Annual International Conference.

Google Scholar

[14] Isa, S. S. (2007). A Study on Roles and Tasks of Construction Managers in Malaysian Construction Industry. Unpublished M. Sc. Thesis . Shah Alam: Universiti Teknologi Mara Malaysia.

DOI: 10.30880/ijscet.2020.11.02.029

Google Scholar

[15] Hassan, F., Samad, Z., Hassan, S., Che Mat, M., & Isnin, Z. (2010). Training the Construction Workforce: A Case Study of Malaysia. Conference Proceeding W089 - Special Track 18th CIB World Building Congress, (pp.230-241).

Google Scholar

[16] Stoof, A., Martens, R. L., Merriënboer, J. J., & Bastiaens, T. J. (2002). The Boundary Approach of Competence: A Constructivist Aid for Understanding and Using the Concept of Competence. Human Resource Development Review , 1, 345.

DOI: 10.1177/1534484302013005

Google Scholar

[17] Cambridge Advanced Learner's Dictionary. (2008). 3rd Ed. Cambridge University Press.

Google Scholar

[18] Dogbegah, R., Owusu-Manu, D., & Omoteso, K. (2009). A Principal Component Analysis of Project Management Competencies for the Ghanaian Construction Industry. Australasian Journal of Construction Economics and Building , 11(1), pp.26-40.

DOI: 10.5130/ajceb.v11i1.1680

Google Scholar

[19] Deist, F. O., & Winterton, J. (2005). What Is Competence? Human Resource Development International , 8(1), pp.27-46.

DOI: 10.1080/1367886042000338227

Google Scholar

[20] Construction Management Association America (CMAA). (n. d. ). CMAA: Advancing Professional Construction and Program Management Worldwide. Retrieved June 25, 2014, from https: /cmaanet. org/competencies.

Google Scholar

[21] Benhart, B. L., & Shaurette, M. (2011). Establishing New Graduate Competencies: Ensuring that Construction Management Curriculums are Delivering Job-Ready, Employees. 47th ASC Annual International Conference Proceedings.

Google Scholar

[22] Lee, N., Ponton, R., Jeffreys, A., & Cohn, R. (2011). Analysis of Industry Trends for Improving Undergraduate Curriculum in Construction Management Education. 47th ASC Annual International Conference Proceedings.

Google Scholar

[23] Wandahl, S. O., & W. Ussing, L. (2010). Construction Management Engineer Education with Focus on Competencies Required by the Construction Industry. Conference Proceeding W089 - Special Track 18th CIB World Building Congress, pp.1-10.

Google Scholar

[24] Mullin, P. T., & N. Williams, A. (2010). Using Skills Gap Analysis in Construction Management to Stimulate a Demand led Model of Curriculum. Conference Proceeding W089 - Special Track 18th CIB World Building Congress, pp.65-79.

Google Scholar

[25] Ahn, Y. H., Kwon, H., Pearce, A. R., & Shin, H. (2010). Key competencies for US construction graduates: an exploratory factor analysis. ASC Proceedings of the 46 th Annual Conference.

Google Scholar

[26] Koch, D. C., & Benhart, B. (2010). Redefining Competencies for Field Supervision. ASC Proceedings of the 46th Annual Conference.

Google Scholar

[27] Arditi, D., Ongkasuwan, D., & Institute, t. C. (2009). Technical Notes: Duties and Responsibilities of Construction Managers: Perceptions of Parties Involved in Construction. Journal of Construction Engineering and Management, 135(12).

DOI: 10.1061/(asce)co.1943-7862.0000115

Google Scholar

[28] Fester, F. C. & Haupt, T. C. (2008). Capstone Courses as the Vehicle to Employability Improvement of Construction Graduates. Proceedings of the International Conference on Building Education and Research (BEAR).

Google Scholar

[29] Gunderson, D. E. (2008). Ranking Construction Superintendent Competencies and Attributes Required for Success. Proceedings of the 44th Annual Associated Schools of Construction Conference. Auburn, Alabama: Auburn University.

Google Scholar

[30] Waluyo, R. (2007). Pendidikan Profesional Konstruksi di Indonesia. Jurnal Teknik Sipil, 8(1), p.23–36.

Google Scholar

[31] Souder, C., & Gier, D. M. (2006). What does the Construction Industry expect from recent Construction Management Graduates? ASC Proceedings of the 42nd Annual Conference.

Google Scholar