[1]
Construction Industry Development Board Malaysia. (2012). Retrieved 6 1, 2012, from Intranet: http: /intranet. cidb. gov. my/iso_diy/consultant. nsf/cons_publish?OpenView&Start=1.
Google Scholar
[2]
Ibrahim, A. R., Roy, M. H., Ahmed, Z., & Imtiaz, G. (2010). An Investigation of the Status of the Malaysian Construction Industry. Benchmarking: An International Journal , pp.294-308.
DOI: 10.1108/14635771011036357
Google Scholar
[3]
Sambasivan, M., & Soon, Y. W. (2007). Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management, Vol. 25 , pp.517-526.
DOI: 10.1016/j.ijproman.2006.11.007
Google Scholar
[4]
Abdul Rahman, H., Berawi, M. A., Berawi, A. R., O. Mohamed, M. O., & Yahya, I. A. (2006). Delay Mitigation in the Malaysian Construction Industry. Journal of Construction Engineering and Management, 132(2) , pp.125-133.
DOI: 10.1061/(asce)0733-9364(2006)132:2(125)
Google Scholar
[5]
Jabatan Audit Negara Malaysia. (2010). Laporan Ketua Audit Negara Tahun 2010: Aktiviti Kementerian/Jabatan dan Pengurusan Syarikat Kerajaan Persekutuan. Kuala Lumpur: Jabatan Audit Negara Malaysia.
DOI: 10.17576/geo-2021-1702-14
Google Scholar
[6]
Unit Penyelarasan Pelaksanaan. (2013, May 27). Pengurusan Projek Sektor Awam. Bengkel Penggubalan Modul Dan Kaedah Pelaksanaan Kursus Pensijilan Pengurusan Projek Sektor Awam . Kuala Lumpur, Malaysia: Jabatan Perdana Menteri.
DOI: 10.17576/pengurusan-2018-52-13
Google Scholar
[7]
Construction Industry Development Board Malaysia (CIDB). (2011). Buletin Statistik Pembinaan Suku Tahunan 2011. Quaterly Report , pp. Suku 4, Bahagian 1.
Google Scholar
[8]
Hassan, F., Maisham, M., Khan, S. M., Alwi, S. A., & Ramli, H. (2010). Competencies, Skills, and Knowledge of Quantity Surveying Graduates. The Quantity Surveying International Convention.
DOI: 10.1109/chuser.2011.6163722
Google Scholar
[9]
Bakar, A. H. (2009). Construction in the Developing World: Issues on Indigenous Contractors. In A. S. Hassan, Contextual Issues of the Built Environment in Malaysia (pp.27-59). Pulau Pinang: Penerbit Universiti Sains Malaysia.
DOI: 10.21315/mjms2016.23.5.1
Google Scholar
[10]
Koskela, L. (1992). Technical Report No. 72: Application of the New Production Philosophy to Construction. Stanford University: Centre for Integrated Facility Engineering.
Google Scholar
[11]
National Center for Construction Education and Research (NCCER). (2008). Project Management: Annotated Instructor's Guide, 2nd Edition. New Jersey: Pearson, NCCER, Contren Learning Series.
Google Scholar
[12]
Halpin, D. W. (2006). Construction Management, 3rd Ed. Hoboken, NJ: John Wiley & Sons, Inc.
Google Scholar
[13]
Farooqui, R. U., & Saqib, M. (2010). Desirable Attributes and Skills for Graduating Construction Management Students. Associated Schools of Construction Proceedings, 46th Annual International Conference.
Google Scholar
[14]
Isa, S. S. (2007). A Study on Roles and Tasks of Construction Managers in Malaysian Construction Industry. Unpublished M. Sc. Thesis . Shah Alam: Universiti Teknologi Mara Malaysia.
DOI: 10.30880/ijscet.2020.11.02.029
Google Scholar
[15]
Hassan, F., Samad, Z., Hassan, S., Che Mat, M., & Isnin, Z. (2010). Training the Construction Workforce: A Case Study of Malaysia. Conference Proceeding W089 - Special Track 18th CIB World Building Congress, (pp.230-241).
Google Scholar
[16]
Stoof, A., Martens, R. L., Merriënboer, J. J., & Bastiaens, T. J. (2002). The Boundary Approach of Competence: A Constructivist Aid for Understanding and Using the Concept of Competence. Human Resource Development Review , 1, 345.
DOI: 10.1177/1534484302013005
Google Scholar
[17]
Cambridge Advanced Learner's Dictionary. (2008). 3rd Ed. Cambridge University Press.
Google Scholar
[18]
Dogbegah, R., Owusu-Manu, D., & Omoteso, K. (2009). A Principal Component Analysis of Project Management Competencies for the Ghanaian Construction Industry. Australasian Journal of Construction Economics and Building , 11(1), pp.26-40.
DOI: 10.5130/ajceb.v11i1.1680
Google Scholar
[19]
Deist, F. O., & Winterton, J. (2005). What Is Competence? Human Resource Development International , 8(1), pp.27-46.
DOI: 10.1080/1367886042000338227
Google Scholar
[20]
Construction Management Association America (CMAA). (n. d. ). CMAA: Advancing Professional Construction and Program Management Worldwide. Retrieved June 25, 2014, from https: /cmaanet. org/competencies.
Google Scholar
[21]
Benhart, B. L., & Shaurette, M. (2011). Establishing New Graduate Competencies: Ensuring that Construction Management Curriculums are Delivering Job-Ready, Employees. 47th ASC Annual International Conference Proceedings.
Google Scholar
[22]
Lee, N., Ponton, R., Jeffreys, A., & Cohn, R. (2011). Analysis of Industry Trends for Improving Undergraduate Curriculum in Construction Management Education. 47th ASC Annual International Conference Proceedings.
Google Scholar
[23]
Wandahl, S. O., & W. Ussing, L. (2010). Construction Management Engineer Education with Focus on Competencies Required by the Construction Industry. Conference Proceeding W089 - Special Track 18th CIB World Building Congress, pp.1-10.
Google Scholar
[24]
Mullin, P. T., & N. Williams, A. (2010). Using Skills Gap Analysis in Construction Management to Stimulate a Demand led Model of Curriculum. Conference Proceeding W089 - Special Track 18th CIB World Building Congress, pp.65-79.
Google Scholar
[25]
Ahn, Y. H., Kwon, H., Pearce, A. R., & Shin, H. (2010). Key competencies for US construction graduates: an exploratory factor analysis. ASC Proceedings of the 46 th Annual Conference.
Google Scholar
[26]
Koch, D. C., & Benhart, B. (2010). Redefining Competencies for Field Supervision. ASC Proceedings of the 46th Annual Conference.
Google Scholar
[27]
Arditi, D., Ongkasuwan, D., & Institute, t. C. (2009). Technical Notes: Duties and Responsibilities of Construction Managers: Perceptions of Parties Involved in Construction. Journal of Construction Engineering and Management, 135(12).
DOI: 10.1061/(asce)co.1943-7862.0000115
Google Scholar
[28]
Fester, F. C. & Haupt, T. C. (2008). Capstone Courses as the Vehicle to Employability Improvement of Construction Graduates. Proceedings of the International Conference on Building Education and Research (BEAR).
Google Scholar
[29]
Gunderson, D. E. (2008). Ranking Construction Superintendent Competencies and Attributes Required for Success. Proceedings of the 44th Annual Associated Schools of Construction Conference. Auburn, Alabama: Auburn University.
Google Scholar
[30]
Waluyo, R. (2007). Pendidikan Profesional Konstruksi di Indonesia. Jurnal Teknik Sipil, 8(1), p.23–36.
Google Scholar
[31]
Souder, C., & Gier, D. M. (2006). What does the Construction Industry expect from recent Construction Management Graduates? ASC Proceedings of the 42nd Annual Conference.
Google Scholar