The Optimization of Mechanized Earthwork Processes

Article Preview

Abstract:

Earthwork processes are the most costly and time consuming component of construction these days and they are characterized by a powerful heavy mechanization which participate on the earthwork process. Current pressure for minimize the cost and maximize the productivity highlights the need to optimize earthworks. In this paper, the optimization process in the area of earthwork processes is described. The selection of the right types of machines for earthwork and its implements has become very difficult these days because of availability of variety of machines models and therefore a multicriteria method is presented to tackle the problem. This paper describes methodology for optimizing the earthwork process according to the selected optimal criteria. The methodology is focused on the proposal phase of optimization where the decision maker has to make a decision and choose the right type of excavators. To overcome the problem of comparing the chosen machines a mathematical modeling approach leading to multicriteria optimization was adopted to make the step wise decision. The methodology gives an mathematical models by which we can solve this problem.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

96-101

Citation:

Online since:

January 2016

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2016 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] PARENTE, M., at al. An evolutionary multi-objective optimization system for earthworks. In: Expert Systems with Applications, Volume 42, Issue 19, 2015, pp.6674-6685.

DOI: 10.1016/j.eswa.2015.04.051

Google Scholar

[2] FU, J. A Microscopic Simulation Model for Earthmoving Operations. In: Proceedings of the International Conference on Sustainable Design and Construction. 2012, pp.218-223.

Google Scholar

[3] HALPHIN, D.,W. An investigation of the use of simulation networks for modeling construction operations. PhD dissertation, Department of Civil Engineering, University of Illinois at Urbana-Champaign, Urbana, IL, (1973).

Google Scholar

[4] LLUCH, J.,F., HALPHIN, D., W. Construction operation and microcomputers. Journal of the Construction Division, ASCE, vol. 108, no. 1, pp.129-145, (1982).

Google Scholar

[5] MARTINEZ, J. Earthmover-Simulation Tool for Earthwork Planning. In: Proceedings of the 1998 Winter Simulation Conference. 1998. pp.1263-1271.

DOI: 10.1109/wsc.1998.745988

Google Scholar

[6] MARTINEZ, J. EZSTROBE - introductory general-purpose simulation system based on activity cycle diagrams. In: Proceedings of the 2001 Winter Simulation Conference, Society for Computer Simulation, (2001).

DOI: 10.1109/wsc.2001.977485

Google Scholar

[7] ABOURIZK, S.,M., HAJJAR, D. A framework for applying simulation in construction. Canadian journal of civil engineering, vol. 25, no. 3, pp.604-617, (1998).

DOI: 10.1139/l97-123

Google Scholar

[8] FU, M.,C., GLOVER, F.,W., APRIL, J. Simulation optimization: A review, new developments, and applications. In: Proceedings of the 2005 Winter Simulation Conference. 2005. 83-95.

DOI: 10.1109/wsc.2005.1574242

Google Scholar

[9] MARZOUK, M., MOSELHI, O.: Selecting earthmoving equipment fleets using genetic algorithms. Simulation Conference, Proceedings of the Winter, Volume. 2, December 2002, pp.1789-1796, ISBN 0-7803-7614-5.

DOI: 10.1109/wsc.2002.1166469

Google Scholar

[10] MOSELHI, O., ALSHIBANI, A. (2007). Crew optimization in planning and control of earthmoving operations using spatial technologies. Journal of Information Technology in Construction, 12, 1–17.

Google Scholar

[11] XU, Y., WANG, L., XIA, G. Research on the optimization algorithm for machinery allocation of materials transportation based on evolutionary strategy. 2011. Procedia Engineering, 15, p.4205–4210.

DOI: 10.1016/j.proeng.2011.08.789

Google Scholar

[12] KATARIA, SAMDANI, S. A., SINGH, A. K. Ant colony optimization in earthwork allocation. International Conference on Intelligent Systems, 2005, p.1–9.

Google Scholar

[13] ZHANG, H. Multi-objective simulation-optimization for earthmoving operations. In: Automation in Construction. 2008. pp.79-86.

DOI: 10.1016/j.autcon.2008.05.002

Google Scholar

[14] SAPHIRA, A., GOLDENBERG, M. AHP based equipment selection model for construction projects. Journal of Construction Engineering and Management, vol. 131, no. 12, 2005, pp.1263-1273.

DOI: 10.1061/(asce)0733-9364(2005)131:12(1263)

Google Scholar

[15] GAŠPARÍK, J., PAULOVIČOVÁ, L., PROKOPČÁK, L., GAŠPARÍK, M. Multi-criteria optimizing method of earthwork machine group selection implemented into soil processes. In: 30th International Symposium on Automation and Robotics in Construction and Mining, ISARC 2013, Held in Conjunction with the 23rd World Mining Congress; Montreal, QC; Canada, 2013, pp.448-458.

DOI: 10.22260/isarc2013/0048

Google Scholar