Application of AHP Method for Determining the Priority of Puskesmas Pembantu Building Maintenance Based on GIS in Sukoharjo District Central of Java

Article Preview

Abstract:

Puskesmas Pembantu (Pustu) building is one of infrastructures which should be maintained because it is the closest in serving people to get health care. So that the Pustu building is always in the maintained and provided optimum performance it is necessary to the maintenance and care. This study was aimed to get the criteria in determining the building maintenance priorities based on the extent of damage and building components of Pustu. This program application was used Analytical Hierarchy Process (AHP) script to analysis each criterion ini building component. The primary data was used directly surveys to give a damage percentage for each building components and for weighting in each building component. The secondary data was obtained from already exist sources (and data from previous studies) as well as the data source was obtained from the regulations of Republic of Indonesia government. The research object totaling 45 Pustu in Sukoharjo. Research results were obtained the Building Condition Index which was used for building maintenance priority of Pustu.Based on the damage level from highest to the lowest was obtained 3 Pustu which has the highest damage level, namely Pustu Cemani (IKB: 67.9042), Pustu Puhgogor (IKB: 68.3214), and Pustu Cabeyan (IKB: 68.3214)

You might also be interested in these eBooks

Info:

Periodical:

Pages:

318-325

Citation:

Online since:

July 2016

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2016 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Suparjo, I., Priyosulistiyo dan Sudarmoko. Building Condition Index Calculation and Cost Analysis Improvement Panti Rapih Nursing Academy Building Post-Earthquake, Civil Engineering Forum UGM, Yogyakarta, (2009).

Google Scholar

[2] Seputro, BS., 2008. Decision Support System Alternative School Building Maintenance (Case Study: SLTPN I Pakem), Civil Engineering Forum No. XVIII/1, Yogyakarta, (2008).

Google Scholar

[3] Sutikno. Determination System Priority Scale Building Maintenance School (Case Study: SMKN I Singkawang), Magister Thesis, UNS, Surakarta, (2009).

Google Scholar

[4] Fakhroji, H. Determination of Priority Maintenance State Building Elementary School in Tabalong, Magister Thesis, ITS, Surabaya, (2009).

Google Scholar

[5] Kusnadi, E. Maintenance Decision Support System Building Public Schools (Case Study: in sub district Tigaraksa, district Tangerang), Magister Tesis, Universitas Sebelas Maret, Surakarta, (2011).

Google Scholar

[6] Habibie, I. Reliability Assessment System Requirements Building Structure With Addition of Earthquake (Case Study: Student Dormitory Building IAIN Gorontalo), Magister Thesis UNS, Surakarta, (2012).

Google Scholar

[7] Nurdin B. A. A. Expert Choice Application For Priority Determination Village Building Maintenance (Case Study: Urban Village Office Building Surakarta), Undergraduate Thesis of Civil Department UNS, Surakarta, (2012).

Google Scholar

[8] Shoheta, I. M. Building evaluation methodology for setting maintenance priorities in hospital buildings, Construction Management and Economics, Volume 21, Issue 7 (2003).

DOI: 10.1080/0144619032000115562

Google Scholar

[9] Sweis, J. G. et. al. Priority Setting for Healthcare Facilities Maintenance, Life Science Journal Volume 11, Special Issue 2, pp.54-65 (2014).

Google Scholar

[10] Hudson et. al, 1997. Infrastructure Management, McGraw-Hill, New York.

Google Scholar