[1]
C. Koch, M. Bendixen, Multiple perspectives on organizing: Projects between tyranny and perforation, Build. Res. Inform. 33 (6) (2005) 536-546.
DOI: 10.1080/09613210500294694
Google Scholar
[2]
PMI, A guide, to the project management body of knowledge, Newton Square, PA: Project Management Institute, (2000).
Google Scholar
[3]
H. J. Yazici, The role of project management maturity and organizational culture in perceived performance, Proj. Manag. J. 40(3) (2009) 14-33.
DOI: 10.1002/pmj.20121
Google Scholar
[4]
D. W. Organ, Organizational citizenship behavior: It's construct clean-up time, Hum. Perform. 10(2) (1997) 85-97.
DOI: 10.1207/s15327043hup1002_2
Google Scholar
[5]
P. M. Podsakoff, M. Ahearne, S. B. MacKenzie, Organizational citizenship behavior and the quantity and quality of work group performance, J. Appl. Psychol. 82(2) (1997) 262-270.
DOI: 10.1037/0021-9010.82.2.262
Google Scholar
[6]
T. Braun, A. I. Ferreira, J. Sydow, Citizenship behavior and effectiveness in temporary organizations, Int. J. Proj. Manag. 31(6) (2013) 862-876.
DOI: 10.1016/j.ijproman.2012.09.003
Google Scholar
[7]
D. R. Denison, Corporate culture and organizational effectiveness, Wiley, New York, (1990).
Google Scholar
[8]
R. E. Quinn, G. M. Spreitzer, The psychometrics of the competing values culture instrument and an analysis of the impact of organizational culture on quality of life, Res. Organ. Change Dev. 1(5) (1991) 115-142.
Google Scholar
[9]
D. R. Denison, A. K. Mishra, Toward a theory of organizational culture and effectiveness, Organ. Sci. 6(2) (1995) 204-223.
Google Scholar
[10]
P. M. Podsakoff, S. B. MacKenzie, J. B. Paine, D. G. Bachrach, Organizational citizenship behaviors: A critical review of the theoretical and empirical literature and suggestions for future research, J. Manag. 26(3) (2000) 513-563.
DOI: 10.1177/014920630002600307
Google Scholar
[11]
J. L. Farh, C. B. Zhong, D. W. Organ, Organizational citizenship behavior in the People's Republic of China, Organ. Sci. 15(2) (2004) 241-253.
DOI: 10.1287/orsc.1030.0051
Google Scholar
[12]
J. Sydow, L. Linkvist, R. DeFillippi, Project-based organizations, embeddedness and repositories of knowledge, Organ. Stud. 25(9) (2004) 1475-1489.
DOI: 10.1177/0170840604048162
Google Scholar
[13]
R. A. Lundin, A. Söderholm, A theory of the temporary organization, Scand. J. Manag. 11(4) (1995) 437- 455.
Google Scholar
[14]
E. H. Schein, Organizational culture, Am. Psychol. 45(2) (1990) 109-119.
Google Scholar
[15]
K. S. Cameron, R. E. Quinn, Diagnosing and changing organizational culture: Based on the Competing Values Framework (Revised Ed. ), Jossery-Bass, San Francisco, (2005).
Google Scholar
[16]
W. Belassi, A. Z. Kondra, O. I. Tukel, New product development projects: The effects of organizational culture, Proj. Manag. J. 38(4) (2007) 12-24.
DOI: 10.1002/pmj.20017
Google Scholar
[17]
R. Thomas, M. Marosszeky, K. Karim, S. Davis, D. McGeorge, The importance of project culture in achieving quality outcomes in construction, Procs 10th Annual Conference on Lean Construction, Gramado, Brazil, 2002, pp.6-8.
Google Scholar
[18]
X. P. Chen, S. S. K. Lam, S. E. Naumann, J. Schaubroeck, Group Citizenship Behaviour: Conceptualization and Preliminary Tests of its Antecedents and Consequences, Manag. Organ. Rev. 1(2) (2005) 273-300.
DOI: 10.1111/j.1740-8784.2005.00012.x
Google Scholar
[19]
Z. H. Aronson, T. G. Lechler, Contributing beyond the call of duty: Examining the role of culture in fostering citizenship behavior and success in project-based work, R&D Manag. 39(5) (2009) 444-460.
DOI: 10.1111/j.1467-9310.2009.00573.x
Google Scholar
[20]
C. Siehl, J. Martin, Organizational culture: A key to financial performance, In B. Schneider (Ed. ), Organizational climate and culture, Jossey-Bass, San Francisco, (1990).
Google Scholar
[21]
B. T. Gregory, S. G. Harris, A. A. Armenakis, C. L. Shook, Organizational culture and effectiveness: A study of values, attitudes, and organizational outcomes, J. Bus. Res. 62(7) (2009) 673-679.
DOI: 10.1016/j.jbusres.2008.05.021
Google Scholar
[22]
J. K. Pinto, D. P. Slevin, B. English, Trust in projects: An empirical assessment of owner/ contractor relationships, Int. J. Project Manag. 27(6) (2009) 638-648.
DOI: 10.1016/j.ijproman.2008.09.010
Google Scholar
[23]
S. O. Cheung, T. W. Yiu, C. L. Man, Interweaving trust and communication with project performance, J. Constr. Eng. Manag. 139(8) (2013) 941-950.
DOI: 10.1061/(asce)co.1943-7862.0000681
Google Scholar
[24]
T. K. Hinkin, A brief tutorial on the development of measures for use in survey questionnaires, Organ. Res. Meth. 1(1) (1998) 104-121.
Google Scholar
[25]
J. F. Hair, W. C. Black, B. J. Babin, R. E. Anderson, R. L. Tatham, Multi-variate data analysis, (6th Ed. ), Prentice-Hall, New Jersey, (2006).
Google Scholar
[26]
K. Molenaar, S. Washington, J. Diekmann, Structural equation model of construction contract dispute potential, J. Constr. Eng. Manag. 126 (4) (2000) 268-277.
DOI: 10.1061/(asce)0733-9364(2000)126:4(268)
Google Scholar
[27]
P. A. Frazier, K. E. Barron, A. P. Tix, Testing moderator and mediator effects in counseling psychology research, J. Couns. Psychol. 51(1) (2004) 115-134.
DOI: 10.1037/0022-0167.51.1.115
Google Scholar