The Second Maintenance and Strengthening of Yonghe Bridge

Article Preview

Abstract:

Tension rocker bearing (TRB) cables installed at auxiliary piers were critical members to sustain the structural system in a prestressed concrete cable-stayed bridge. Once these cables fractured or broken, its structural system would be transferred. Based on diseases caused by fracture of TRB cables in Yonghe Bridge, corresponding maintenance or strengthening measures were described in detail. These measures included replacement of TRB cables, strengthening of the closure segment of main girder at each side span, and adjustment of stay cable forces. Monitoring results showed that, its structural system was finally and completely rehabilitated, and the safety factor of new TRB cables is enough under the most unfavorable load combination. Moreover, the line shape of main girder and the inclined displacement at the top of each pylon were improved effectively. Thus, Yonghe Bridge accumulated some valuable experience for maintenance or strengthening of existing prestressed concrete cable-stayed bridges, and also made a useful exploration.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1074-1081

Citation:

Online since:

September 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jinquan Zhang, Wentao Wang: Handbook of inspection and strengthening for bridges (Volume 2), China Communications Press, Beijing(2007), pp.926-943 (in Chinese)

Google Scholar

[2] Wentao Wang: Replacement of Stay Cables for Cable-stayed Bridges, China Communications Press, Beijing (2006), pp.53-68 (in Chinese)

Google Scholar

[3] Guxuan Li, Shangying Deng, and Wen Xiao, et al: Guangdong Highway Communications Vol.26 (2000), pp.176-178 (in Chinese)

Google Scholar

[4] Guoxiong Lin, Shuanquan Qin, and Huamin Zhu, et al: Bridge Construction Vol.31(2001), pp.18-21 (in Chinese)

Google Scholar

[5] Hongjiang Li, Wanheng Li, and Jinquan Zhang, et al:World Bridges Vol.37 (2009), pp.53-56 (in Chinese)

Google Scholar

[6] Hongjiang Li: Proceedings of the 18th national conference on structural engineering, Guangzhou, China(2009), pp.465-470 (in Chinese)

Google Scholar

[7] Xing Yang, Min Zhang, Shuixing Zhou: Journal of Chongqing Jiaotong University (Natural Science) Vol.28 (2009), pp.508-511 (in Chinese)

Google Scholar

[8] Hongjiang Li: Journal of Civil, Architectural and Environmental Engineering Vol. 31(2009), pp.81-85 (in Chinese)

Google Scholar

[9] China Communications Press (CPC): Guidelines for Design of Highway Cable-stayed Bridge, Beijing(2007) (in Chinese)

Google Scholar