Evaluation for Flood Control Influence on Niujiazhuang Bridge

Article Preview

Abstract:

It is necessary to evaluate the flood control impact of a river-crossing bridge . Aiming at the problems exited in the evaluation,the analysis and discussion on the procedures,methods contents and related issues of the evaluation are made here by taking a bridge over branches of the XiaoheRiver for example.At the same time,the feasible engineering measures are proposed for building of the bridge,which will be applied to similar projects in the future.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1185-1189

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shijiazhuang transport to investigate design. SR feasibility study repor about 107 national road [R].2010. In Chinese.

Google Scholar

[2] Shouze Ye, Hydrological and Water-resource Calculation [M].Beijing: China water conservancy and hydropower press.1994.In Chinese.

Google Scholar

[3] SL278-2002. Regulation for Hydrology Computation of Water resource and Hydropower projects [s]. 2002. In Chinese.

Google Scholar

[4] JTG C30-2002.Hydrological Specifications for Survey and Design of Highway Engineering[s]. 2002. In Chinese.

Google Scholar

[5] JTJ062-1991.Specifications for Survey and Design of Highway Bridge Site [s]. 1991. In Chinese

Google Scholar

[6] GB50201-94. Standard for Flood Controd [S] .1994. In Chinese.

Google Scholar