In view of certain areas of Guizhou are soft sandstone rock, where single block of rock's hardness is very low and easily crushed, complicated hydrogeology and low level of complex surrounding rock and geological conditions, geological radar prediction is used before the excavation of the tunnel, and New Austrian Tunneling Method was used in the construction. The process of construction segment had been monitored and measured, and the deformation of tunnel had been controlled. According to the situation during excavation and monitoring, the construction method was further improved. Through tracing and monitoring the tunnel construction of from zk40+430 to zk40+630 sections for two months, showed that the tunnel construction method is effective in this paper.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2091-2095

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Engineering classification of rock standard"(GB50218-94). Beijing: China Building Industry Press (2000), (In Chinese)

Google Scholar

[2] xiaohong Li. New Austrian Tunneling Method and Measurement Technology [M] Beijing: Science Press .(2002), (In Chinese)

Google Scholar

[3] Technical specifications for construction of highway tunnel" (JTJ042-94) (In Chinese)

Google Scholar

[4] Technical specification of bolting and shotcreting supporting" (GB50086-2001) (In Chinese)

Google Scholar

[5] Technical code for waterproofing of underground works " (GB50108-2001) (In Chinese)

Google Scholar

[6] jianxun Chen, jianqin Ma. Test technology of tunnel construction Beijing: China Communications Press (2004), (In Chinese)

Google Scholar