Study on Stability of Underwater Trench of Immersed Tunnel of Hongkong-Zhuhai-Macau Bridge

Article Preview

Abstract:

The studies carried out to appropriate slope ratio for underwater trench of immersed tunnel of Hongkong-Zhuhai-Macau Bridge. A test trench of 100-meter-long and 21-meter-width was excavated under Lingding Ocean along designed axis of immersed tunnel. The trench includes four slope ratio, such as 1:5, 1:6, 1:8 and 1:10. Two actual measurement which includes multibeam measurement and single beam double frequency measurement were used to measure water depth and section form in different time. It is recommended that slope ratio 1:6 can be adopted for underwater trench of immersed tunnel of HZM Bridge.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2212-2220

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Mingqing Xiao: Mater. ModernTunnelling Technology Vol. 38 (2001), pp.42-46 (In Chinese)

Google Scholar

[2] Shunhua Zhou, Jianguo Liu, Binglong Wang, et.al.. Vol. 23 (2001), pp.76-79 (In Chinese)

Google Scholar

[3] Shunhua Zhou, Jianguo Liu, Yaochen Li. Vol. 37 (2002), pp.180-185 (In Chinese)

Google Scholar

[4] Feng Lin, Lubin Tao, Hehua Zhu. Vol. 22 (2003), pp.2149-215 (In Chinese)

Google Scholar

[5] CCCC Highway Consultants CO., Ltd, CCCC Guangzhou Dredging Co., Ltd, Special Research Report on Excavation Technology of Immersed Tunnel Foundation Trench and Observation Test of Siltation For Preliminary Design of the Main Project of Hong Kong-Macau-Zhuhai Bridge. Guangzhou: 2010. (In Chinese)

DOI: 10.59238/j.pt.2010.06.002

Google Scholar