Analysis on Optimization Construction Procedures of Small Spacing Tunnel in Xiamen Airport Highway

Article Preview

Abstract:

The small spacing tunnel is a kind of tunnel structural style which situates between ordinary tunnel and double-arch tunnel. It has attracted great attention due to its unique merit. This paper takes Xiamen Airport highway tunnel as an example, considering four different construction steps during small spacing tunnel construction. Author applied MIDAS-GTS software to carry on numerical simulation, the influences of excavating orders of four different construction steps about stratum distortion and stable situation of middle rock pillar are analyzed. The analytical results indicate that construction Step 2 and construction Step 4 can suit actual situation of this project.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2226-2231

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xiaoguang Le,Wei Liu. The optimization analysis of small spacing construction of bias highway tunnel. Journal of Highway traffic science and technology,2005,22(8):61-64:(in Chinese)

Google Scholar

[2] Chunjiang Qiao,Guangyi Zhu. The design and research of super small spacing tunnel.Journal of Highway,2006,(7):179-184:(in Chinese)

Google Scholar

[3] Bo Huang. The key points of construction technology of small spacing tunnel .Journal of Highway,2003,(12):132-136:(in Chinese)

Google Scholar

[4] Xuhui Wang. The analysis on rationality of construction method of urban small spacing tunnel. Journal of Railroad construction,2008:58-61:(in Chinese)

Google Scholar

[5] The application example course and difficult explanation of MIDAS/Gen. Beijng: China Construction Industry Press, 2010, (in Chinese).

Google Scholar