Practical Calculation of Highway Foundation Settlement of the Yellow River Alluvial Plain

Article Preview

Abstract:

In order to solve the problem of great error in calculating the Yellow River alluvial plain highway’s foundation settlement with delamination summation-method and regulate formula method,we put forward the reason of calculating the final settlement by drilling standard penetration number.It is according to the principles of delamination summation-method and elastic theory method and it is combined with engineering prospecting tests results.Finally,we inference the empirical formula in calculating the final settlement by standard penetration number.The comparison of the calculation of the final settlement by drilling standard penetration number and the statistics by actual observation of jinan-heze expressway has proved the correctness of calculation formula.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

260-263

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Guanghui Shao,Nengsen Wu.Soil Mechanism and Foundation, People's Tansportation Press. 2007,82-91. (In Chinese)

Google Scholar

[2] Qingsen Shang , Haibo Zhu, Hongqing Du.Journal of Highway and Transportation. 2004.1,22-25. (In Chinese)

Google Scholar

[3] Xizhe Chen.Soil Mechanism and Foundation. Tsinghua University Press. 2004,77-80. (In Chinese)

Google Scholar

[4] Dazhao Gao, Juyun Yuan.Soil and Soil mechanism.People's Tansportation Press. 2003,98-100. (In Chinese)

Google Scholar

[5] Jinan-Heze Highway Geology Gurvey Report.2003. (In Chinese)

Google Scholar