An Experimental Research on Optimization of Trajectory Bucket for Spillway Tunnel Outlet at Sanliping Hydropower Project

Article Preview

Abstract:

Several optimized designs of trajectory bucket pattern for spillway tunnel outlet are compared in the experiment of Sanliping hydropower project integer physical model and the results show that energy dissipation of outflow nappe is sufficient after optimization and no scouring occur near the riverbank either at high water level or at low water level, which ensure the security of spillway structure. And these experimental results can provide a scientific foundation for the design of Sanliping project.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2740-2745

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Minghui Yu. Experimental Report on Sanliping Hydroelectric Engineering 1/90 Integer Physical Models in Fang County of Hubei Province, Wuhan University Publications, Wuhan, China, 2006. (In Chinese)

Google Scholar

[2] Wei Li and Xiaoping Xu, Hydraulics, Wuhan hydraulic and Hydropower University Press, Wuhan, China, 2006. (In Chinese)

Google Scholar

[3] Hongshuo Wang, Hydraulic structures, Water Resources and Electric Power Press, Beijing, China, 1991. (In Chinese)

Google Scholar

[4] Hangen Ni, Qingguo Wang, Yucong Liu, The application of unusual flaring piers to enhance energy dissipation of overflow discharge, Journal of Hydraulic Engineering. Vol. 8(2000) 55-59. (In Chinese)

Google Scholar

[5] Chunhua Lei, Shihao Tian, Weicai Fei, Experimental Study on the Spillway Shape Optimization in Xiaohe Hydropower Station, China Rural Water and Hydropower, Vol. 9(2006)137-139. (In Chinese)

Google Scholar