An Approach to Reduce Production Lead Time in the Valve Manufacturing Industry

Article Preview

Abstract:

Lean manufacturing aids improved productivity and product quality by identifying and eliminating waste. The present work aims to utilize Value Stream Mapping (VSM), a lean manufacturing technique to minimize the cycle time in the production of valves. A current state map is developed with available information gathered from the production unit, to identify the time-consuming factors like waiting time, improper inspection, and the lack of material and resources for manufacturing. Problem-solving techniques like 5s, JIT, KANBAN, and KAIZEN are used to reduce time-consuming activities. Value-Added and Non-value-added activities are identified through Current State Map. Activities such as placing a purchase order, drawing, assembling, testing, packaging, and shipping are Value-added activities. Non-Value-added activities are identified as rework, inspection, movement, waiting for the next process, and over-processing. The job waiting time between the next process is reduced by 70% using the future state map and the productivity is enhanced.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

167-174

Citation:

Online since:

March 2024

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2024 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Amir Azizi, Thulasi Manoharan, "Designing a future Value Stream Mapping to reduce Lead Time using SMED-A case study", 2nd International Material, Industrial and Manufacturing Engineering Conference. Procedia Manufacturing vol.2, p.153 – 158, 2015.

DOI: 10.1016/j.promfg.2015.07.027

Google Scholar

[2] A.V. Damale, K.N. Nandurkar, (2011), "Application of Value Stream Mapping in an Indian Automotive Industry", International Journal of Industrial Engineering Practice, vol.1, no. 2, pp.152-157, 2012.

Google Scholar

[3] K.Venkataraman, B.VijayaRamnath, V.Muthu Kumar, C.Elanchezhian, "Application of Value Stream Mapping for reduction of cycle time in a Machining process" 3rd International Conference on Materials Processing and Characterisation, Procedia Materials Science, vol. 6, p.1187 – 1196, 2014.

DOI: 10.1016/j.mspro.2014.07.192

Google Scholar

[4] Anupam Sinha, Vinod Kumar, Umed Khod, "Application of value stream mapping in small scale industry", International Journal of Mechanical Engineering and Robotics Research, vol. 3, no. 3, pp.738-746, 2014.

Google Scholar

[5] Thomas Rohac, Martin Januska, "Value Stream Mapping demonstration on real case study", 25th DAAAM (Danube Adria Association for Automation & Manufacturing) International Manufacturing and Automation, Procedia Engineering vol.100, p.520 – 529, 2015.

DOI: 10.1016/j.proeng.2015.01.399

Google Scholar

[6] K. Ulf, Teichgraber, Maximilian de Bucourt, "Applying Value Stream Mapping techniques to eliminate non-value added waste for procurement of endovascular stents", European Journal of Radiology, vol.81, no.1, p.47– 52, 2012.

DOI: 10.1016/j.ejrad.2010.12.045

Google Scholar

[7] William M. Goriwondo, Samson Mhlanga, Alphonce Marecha, "Use of Value Stream Mapping Tool for waste reduction in Manufacturing", Case study for Bread manufacturing in Zimbabwe, Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, pp.236-241, 2011.

Google Scholar

[8] Adam Brown, Joseph Amundson, Fazleena Badurdeen, "Sustainable Value Stream Mapping in different manufacturing system configurations", application case study. Journal of Cleaner Production, vol.85, pp.164-179, 2014.

DOI: 10.1016/j.jclepro.2014.05.101

Google Scholar

[9] Thomas edtmayr, Alexander Sunk, Wilfried Sihn, "An approach to integrate parameters and indicators of sustainability management into Value Stream Mapping", 48th CIRP conference on Manufacturing Systems, Procedia CIRP 41, p.289 – 294, 2015.

DOI: 10.1016/j.procir.2015.08.037

Google Scholar

[10] G.Sahitya Reddy, K.Harsha Lingareddy, Jagadeeshwar, "Value stream mapping in a manufacturing industry", International Journal of Advanced Engineering Technology, vol. 4, pp.20-23, 2013.

Google Scholar

[11] S.Silva, K. P. N, "Applicability of value stream mapping in the apparel industry in Sri Lanka", International Journal of Lean Thinking, vol. 3, pp.36-41, 2012.

Google Scholar

[12] Satish Tyagi, Alok Choudhary, Xianming Cai, Kai Yang, "Value Stream mapping to reduce the lead-time of a product development process", International Journal of Production Economics, vol.160, pp.202-212, 2015.

DOI: 10.1016/j.ijpe.2014.11.002

Google Scholar

[13] M.Anas, Atieh, Hazem Kaylani, Ahmad Almuhtady, Omar Al-Tamimi, "Value stream mapping and simulation hybrid approach: application to glass industry", International Journal of Advanced Manufacturing Technology, vol. 84, pp.1573-1586, 2016.

DOI: 10.1007/s00170-015-7805-8

Google Scholar

[14] S.Vinodh, R. Ben Ruben, P.Asokan, "Life cycle assessment integrated value stream mapping framework to ensure sustainable manufacturing: a case study", Clean Technologies and Environmental Policy, vol. 18, pp.279-295, 2016.

DOI: 10.1007/s10098-015-1016-8

Google Scholar

[15] Yuchu Huang, Masayoshi Tomizuka, "Production flow analysis through environmental value stream mapping: a case study of cover glass manufacturing facility", The 24th CIRP Conference on Life cycle Engineering- Procedia, vol. 61, pp.446-450, 2017.

DOI: 10.1016/j.procir.2016.11.180

Google Scholar

[16] K.L. Jeyaraj, C. Muralidharan, R. Mahalingam, S.G. Deshmukh, "Applying Value Stream Mapping Technique for Production Improvement in a Manufacturing Company: A Case Study" , Journal Institute of Engineers, India Ser. C , vol. 94(1)(January–March 2013), p.43–52, 2013.

DOI: 10.1007/s40032-012-0053-x

Google Scholar

[17] Senthil Kannan, N., Parameshwaran, R., Saravanakumar, P.T. et al. Performance and Quality Improvement in a Foundry Industry using Fuzzy MCDM and Lean Methods. Arab J Sci Eng 47, 15379–15390 (2022).

DOI: 10.1007/s13369-022-06627-6

Google Scholar

[18] M. Balaji, S.N. Dinesh, S. Raja, Ram Subbiah, P. Manoj Kumar,Lead time reduction and process enhancement for a low volume product, Materials Today: Proceedings,Vol 62(4), 2022, pp.1722-1728.

DOI: 10.1016/j.matpr.2021.12.240

Google Scholar