The Monitoring Data Analysis of Cover System in Subway Station

Article Preview

Abstract:

Fengtail North Road Station uses a open and cover combination of laying fabricated strap method for the first time, so we monitor the Cover system very closely. We draw schedule curves and analysis the monitoring data for the main component’s monitoring projects of the Cover system. Results show that the deformation values of the components of the Cover system are small, but the values of piles top displacement and settlement are large, at the same time, the lattices of Cover boards have good wear-resistance ability. The conclusion has very great help for optimizing the system design and the promotion of laying fabricated strap method.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1814-1817

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Beijing General Municipal Engineering Design&Research Institute. The main pit enclosure structure construction drawings of station structure of Fengtai North Road Station [R]. Beijing: Beijing General Municipal Engineering Design&Research Institute, 2007.

DOI: 10.59238/j.pt.2005.03.001

Google Scholar

[2] Beijing General Municipal Engineering Design&Research Institute. the pit excavation monitoring transverse section of station structure of Fengtai North Road station [R]. Beijing: Beijing General Municipal Engineering Design&Research Institute, 2007.

DOI: 10.59238/j.pt.2005.03.001

Google Scholar