p.1793
p.1800
p.1805
p.1810
p.1814
p.1818
p.1824
p.1828
p.1833
The Monitoring Data Analysis of Cover System in Subway Station
Abstract:
Fengtail North Road Station uses a open and cover combination of laying fabricated strap method for the first time, so we monitor the Cover system very closely. We draw schedule curves and analysis the monitoring data for the main component’s monitoring projects of the Cover system. Results show that the deformation values of the components of the Cover system are small, but the values of piles top displacement and settlement are large, at the same time, the lattices of Cover boards have good wear-resistance ability. The conclusion has very great help for optimizing the system design and the promotion of laying fabricated strap method.
Info:
Periodical:
Pages:
1814-1817
Citation:
Online since:
September 2011
Authors:
Keywords:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: