Monitoring and Treatment during the Water Leakage Process of a Deep Subway Station Pit

Abstract:

Article Preview

A remedy scheme of water leakage in the deep foundation pit of a subway station is introduced. The deformation and axial forces of the supporting structure as well as the underground water level were monitored during the leaking prevention process. At the same time, a plane model was developed to simulate the construction process of foundation pit by FEM. Then, the fundamental reason for the leaking of the foundation pit was analyzed by numerical results and in situ measured data. Furthermore, importance of the strength of the supporting structure to the excavation of the foundation pit was also detailed demonstrated. Finally, the remedy measures were put forward to prevent the water leakage, which were proved to be effective and feasible in practice.

Info:

Periodical:

Edited by:

Xuejun Zhou

Pages:

1951-1956

DOI:

10.4028/www.scientific.net/AMM.94-96.1951

Citation:

C. S. Wu et al., "Monitoring and Treatment during the Water Leakage Process of a Deep Subway Station Pit", Applied Mechanics and Materials, Vols. 94-96, pp. 1951-1956, 2011

Online since:

September 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.