Monitoring and Treatment during the Water Leakage Process of a Deep Subway Station Pit

Article Preview

Abstract:

A remedy scheme of water leakage in the deep foundation pit of a subway station is introduced. The deformation and axial forces of the supporting structure as well as the underground water level were monitored during the leaking prevention process. At the same time, a plane model was developed to simulate the construction process of foundation pit by FEM. Then, the fundamental reason for the leaking of the foundation pit was analyzed by numerical results and in situ measured data. Furthermore, importance of the strength of the supporting structure to the excavation of the foundation pit was also detailed demonstrated. Finally, the remedy measures were put forward to prevent the water leakage, which were proved to be effective and feasible in practice.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1951-1956

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jianhang Liu and Xueyuan Hou: Excavation engineering handbook[M], Beijing:China Architecture and Building Press, 1997. (in Chinese)

Google Scholar

[2] GB50497-2009 Technical Code for Monitoring of Building Foundation Pit Engineering [S],Beijing:China Architecture and Building Press, 2009. (in Chinese).

Google Scholar

[3] Guanfeng An and Junyue Gao: Chinese Journal of Geotechnical Engineering, June.2007, Vol.29 No.6 (in Chinese)

Google Scholar

[4] Junhu Li, Longxiang Zhou, Huawei Tong and Lei Chen: Journal of Guangzhou University (Natural Science Edition),Feb.2010, Vol. 9 No.1(in Chinese).

Google Scholar

[5] Xiaowei Wang, Huawei Tong and Zhiqiang Li : Construction Technology,May.2009, Vol. 38 No.5(in Chinese)

Google Scholar

[6] Xianhua Zhu, Hai-hong Mo and Juan Huang: Guangdong Architecture Civil Engineering, May.2009, No.5(in Chinese)

Google Scholar