Analysis on Key Points of the Post-Disaster Reconstruction Engineering Cost Management

Abstract:

Article Preview

Based on the study of some post-disaster reconstruction project examples and related policy documents,this article analyses the existing problems of the post-disaster reconstruction project engineering cost combining with the actual engineering projects of the post-Wenchuan earthquake reconstruction. Then it discusses the factors that affect the post-disaster reconstruction project engineering cost and puts forward some suggestions for it in the end. The study of this paper expects to provide some theoretical and practical references for the subsequent engineering practices, and hopes not only promoting the limited government post-disaster reconstruction special funds to realize their maximum utility, but also enhancing the whole level of our countries'reconstruction management and engineering cost control.

Info:

Periodical:

Edited by:

Xuejun Zhou

Pages:

306-309

DOI:

10.4028/www.scientific.net/AMM.94-96.306

Citation:

J. Y. Li "Analysis on Key Points of the Post-Disaster Reconstruction Engineering Cost Management", Applied Mechanics and Materials, Vols. 94-96, pp. 306-309, 2011

Online since:

September 2011

Authors:

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.