Application of Super-High Fastener Steel-Pile Scaffold in High Slope Treatment of JINPIN Hydropower Station
Abstract:
JINPIN Hydropower Station is a high arc dam of world class, and it is a difficult problem to set up scaffold in the treatment of high sloping of atomization region on two banks. Adopt fastener steel-pile scaffold combining with anchor wires, and set up the super-high working platform. This paper introduced the method of setting up the fastener steel pile scaffold, and special construction measures in the treatment of high sloping, which can be referential for scaffolding works.