Application of Super-High Fastener Steel-Pile Scaffold in High Slope Treatment of JINPIN Hydropower Station

Article Preview

Abstract:

JINPIN Hydropower Station is a high arc dam of world class, and it is a difficult problem to set up scaffold in the treatment of high sloping of atomization region on two banks. Adopt fastener steel-pile scaffold combining with anchor wires, and set up the super-high working platform. This paper introduced the method of setting up the fastener steel pile scaffold, and special construction measures in the treatment of high sloping, which can be referential for scaffolding works.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

594-597

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Cui Xianyue,Xia Changhua,Lu Wenge. Application of scaffold on high slop treatment engineering. Construction technology,37(sup),367—370,2008.

Google Scholar

[2] Liu Hongbo,Yang Zisheng,Han Wei. Design and Construction of a Large Scaffolding and Structural Steel Support System. Construction technology, 33 (2), 31—32,2008.

Google Scholar

[3] Li Xuejin,Zhao Keming.Analyze impacts of wind load on height of steel pipe scaffold with fasteners.Architecture technology,39(7):545—547,2008.

Google Scholar