Paper Title:
Engineering Practice of Segmental Assembly in Large Spancurved Bridge by Scaffolds
  Abstract

Part of Xiping railway south cave temple bridge segments are on easement curve. considering the project time limit and construction difficulties of large span curved bridge, the construction team adopted 64m soffit scaffolding composite column structure to assemble the precasted box girder segments ,this method can better solve the technical problems of nonuniform stress distribution in transverse beam and upright tubes of the bracket. Therefore, this paper introduces in details the bracket structure as well as the key construction technologies of segmental beam rand bracket. the experience can provide good reference for similar engineering.

  Info
Periodical
Chapter
Chapter 5: Traditional Construction Materials
Edited by
Xuejun Zhou
Pages
796-799
DOI
10.4028/www.scientific.net/AMM.99-100.796
Citation
L. J. Yang, "Engineering Practice of Segmental Assembly in Large Spancurved Bridge by Scaffolds", Applied Mechanics and Materials, Vols. 99-100, pp. 796-799, 2011
Online since
September 2011
Authors
Export
Price
$35.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Ke Zhong, Jing Hu, Bin Zheng
Chapter 1: Key Engineering Materials
Abstract:Firstly the pavement compound system model of steel beam and steel-concrete combined section are established based on structure...
103
Authors: Jing Feng Wang, Bo Wang, Zhong Ming Zheng
Chapter 9: New Technology for the Preparation and Construction of Building Materials
Abstract:To research the mechanical behaviour of the novel composite beam with concrete filled steel tubular (CFST) truss, an experimental study of...
1680