Load Shedding Scheme Optimization Design of the Dump Slope

Article Preview

Abstract:

In this paper, xingshan iron mine as an engineering example. Based on slip field theory, numerical simulation method and limit equilibrium method for the mine slope stability research and evaluation. Meanwhile, a variety of load shedding scheme was designed and optimized design. The results showed that the final dump slope angle is 19.2, considering the most unfavorable conditions in saturated with earthquake. And ultimate load shedding scheme can guarantee the slope stability, and saves the load shedding costs is about 20 million yuan. The economic effect is remarkable.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1004-1005)

Pages:

1615-1618

Citation:

Online since:

August 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Feng Shaojie, Sun Shiguo, Duan Weiguo, Yao Aimin. Ming Research and Development, (2009). P. 16. (In Chinese).

Google Scholar

[2] Feng Shaojie, Sun Shiguo, Yi Yanan. Advanced Materials Research Vols. 734-737 (2013).

Google Scholar

[3] Shaojie Feng, Xuefang Zhao, Shiguo Sun. Advanced Materials Research. (2014).

Google Scholar

[4] Sun Shiguo, Fan Caibing, Li Zhanke, Lu Hai. Metal Mine, (2010): P. 36. (In Chinese).

Google Scholar

[5] Cui Yinghui. Beijing: North China University of Technology, (2010). (In Chinese).

Google Scholar

[6] Wang Haibin, Li Xiaochun, Mi Zijun. Journal of Rock Mechanics and Geotechnical Engineering , (2011).P. 2103 (In Chinese).

Google Scholar