Research on Building Construction with Application and Analysis of Total Float in the Activity-on-Arrow Network

Article Preview

Abstract:

Building construction usually delay by various kinds of reason during construction and equipment installation process. It maybe cause total duration to be delayed by one work delaying, also it maybe not affect the total duration. It depend on nature of the work and time delayed above the two situationgs. Firstly activity-on-arrow network is introduced in the article, secondly critical path and total float are analysed, then we have controlled and analysed the construction progress by using total float in the actual projection, finally we have made the conclusion.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

156-159

Citation:

Online since:

August 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Writing committee of examination book on senior construction engineer, Construction Project Management, Peking, China Architecture and Building Press, 2013: 252-260.

Google Scholar

[2] MOHURD, Technical specification of engineering network planning, Peking, China Architecture and Building Press, 2000: 06-07.

Google Scholar

[3] Writing committee of examination book on senior construction engineer, Construction Management and Practice, Peking, China Architecture and Building Press, 2013: 317-322.

Google Scholar