Application of Improved LEC Method in the Construction of Water Conservancy Project Hazard Evaluation
Abstract:
This paper based on the characteristic of large scale、more Individual project、Operation difficulty in water conservancy and Hydropower Engineering,make a improvement of the original LEC method in order to get the purpose of reduce the risk coefficient. The results show that:the results of the improved LEC method in this paper is more simple and more accurate than the original improved LEC method. Accurate estimation of hazard levels not only can be appropriate to reduce the budget of production units in the construction safety,but also means that the increase of enterprise benefit and social benefit.
Info:
Periodical:
Pages:
297-299