Application of Improved LEC Method in the Construction of Water Conservancy Project Hazard Evaluation

Article Preview

Abstract:

This paper based on the characteristic of large scale、more Individual project、Operation difficulty in water conservancy and Hydropower Engineering,make a improvement of the original LEC method in order to get the purpose of reduce the risk coefficient. The results show that:the results of the improved LEC method in this paper is more simple and more accurate than the original improved LEC method. Accurate estimation of hazard levels not only can be appropriate to reduce the budget of production units in the construction safety,but also means that the increase of enterprise benefit and social benefit.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

297-299

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Huang Fuyi. The hazard identification and risk assessment of Water conservancy and hydropower project construction[J]. Water resources and Hydropower Engineering, 2004, 5(35), 127-128.

Google Scholar

[2] Zhou Yongjun. Hazard identification of water conservancy and hydropower construction[J]. Labor protection, 2007, (1): 88-90.

Google Scholar

[3] Zhou Yongjun. Cure and manage water conservancy and hydropower construction hazard[J]. Water power of Sichuan, 2006, 21(11): 131-134.

Google Scholar

[4] Ren Jianbin, Wen Jie. Practice of hazard source identification and risk evaluation of Water conservancy construction enterprise[J]. Water conservancy and hydropower construction, 2004, 26(2): 94-96.

Google Scholar

[5] Wang Pingping. Discussion on the construction management of water conservancy project[J]. Chinese waterway, 2007, (10): 121-122.

Google Scholar