Life Cycle Cost Aspects of BIPV and Conventional Building Components

Abstract:

Article Preview

Building integrated photovoltaic (BIPV) components can replace conventional components for the construction of building skins and they can produce renewable electricity during their lifetime. BIPV components can have therefore lower life cycle costs than conventional building components, which do not generate any gain during their lifecycle. The detailed calculation of economical profitability of BIPV is dependent on multiple factors, such as the specific case and the specific basic conditions. However, exemplary calculations indicate that it is possible to compensate the cumulative costs of BIPV components, at least to a significant degree, if the gain of the renewable electricity production during a BIPV component’s lifetime is considered in the life cycle cost calculations. Accordingly, BIPV systems are in general economically more profitable than ground-mounted PV power plants in open areas.

Info:

Periodical:

Edited by:

Anil K. Bhatnagar

Pages:

696-700

Citation:

T. Schuetze, "Life Cycle Cost Aspects of BIPV and Conventional Building Components", Advanced Materials Research, Vol. 1051, pp. 696-700, 2014

Online since:

October 2014

Export:

Price:

$41.00

[1] Bendel, C. In Multifunktionale Photovoltaikprodukte, 23. Symposium Photovoltaische Solarenergie, Kloster Banz, Bad Staffelstein, Germany, 2008. 03. 05. -07, 2008; (OTTI), O. T. -T. I. e. V., Ed. Ostbayerisches Technologie-Transfer Institut e.V. (OTTI): Kloster Banz, Bad Staffelstein, Germany, (2008).

[2] Hullmann, H.; Schuetze, T.; Bendel, C.; Funtan, P.; Kirchhof, J. Multifunktionale Photovoltaik – Photovoltaik in der Gebäudehülle; hwp - hullmann, willkomm & partner & ISET - Institut für Solare Energieversorgungstechnik: Hamburg & Kassel, Germany, 2006. 03, (2006).

[3] Schuetze, T.; Hullmann, H.; Bendel, B. In Multifunctional Photovoltaic Building design and efficient photovoltaic use of solar energy, Rio 9 World Climate and Energy Event, Rio De Janeiro, Brazil, 2009. 03. 17-19, 2009; Krauter, S., Ed. Rio Solar: Rio De Janeiro, Brazil, (2009).

DOI: https://doi.org/10.1016/0038-092x(91)90083-9

[4] Schuetze, T.; Hullmann, H. In Wirtschaftliche Aspekte beim Einsatz multifunktionaler photovoltaischer Bauteile, 26. Symposium Photovoltaische Solarenergie, Kloster Banz, Bad Staffelstein, Germany, 2011. 03. 02. – 04, 2011; (OTTI), O. T. -T. I. e. V., Ed. Ostbayerisches Technologie-Transfer Institut e.V. (OTTI): Kloster Banz, Bad Staffelstein, Germany, (2011).

[5] Unholzer, M.; Bartels, D.; Lützkendorf, T.; Spars, G. In Wechselwirkungen zwischen der energetischen Qualität von Gebäuden und ihren Lebenszykluskosten - Vorstellung methodischer Grundlagen und realer Nutzungskosten von Demonstrationsbauvorhaben des Forschungsprojektes EnOB (Energieoptimiertes Bauen), Bauhaus. SOLAR, Erfurt, 2010, Erfurt, Germany, 2010. 11. 10-11, 2010; Erfurt, Germany, (2010).

[6] Fraunhofer-Institut für Windenergie und Energiesystemtechnik IWES Multielement - Multifunktionale PV-Bauelemente. Available online: http: /www. pv-multielement. de (2014. 08. 09).

[7] pvXchange GmbH, Price Index crystalline modules & thin film modules - September 2013 Available online: http: /www. pvxchange. com/priceindex/Default. aspx?langTag=en-GB (2014. 08. 09).

[8] IEMB Institut für Erhaltung und Modernisierung von Bauwerken e.V. an der TU Berlin, Lebensdauer von Bauteilen und Bauteilschichten, Info – Blatt Nr. 4. 2, Januar 2009. In 42 ed.; Kompetenzzentrum der Initiative Kostengünstig qualitätsbewusst Bauen, im Bundesinstitut für Bau-, Stadt- und Raumforschung (BBSR) im Bundesamt für Bauwesen und Raumordnung (BBR): Berlin, Germany, (2009. 01); p.10.

DOI: https://doi.org/10.1007/978-3-7091-0681-5_6

[9] Solarenergie-Förderverein Deutschland e.V. Solarstrom-Vergütungen im Überblick. Available online: http: /www. sfv. de/lokal/mails/sj/verguetu. htm (2014. 08. 09).

[10] BDEW Bundesverband der Energie- und Wasserwirtschaft e.V. BDEW-Strompresianalyse Juni 2014. Available online: http: /bdew. de/internet. nsf/id/20140702-pi-steuern-und-abgaben-am-strompreis-steigen-weiter-de/$file/140702 BDEW Strompreisanalyse 2014 Chartsatz. pdf (2014. 08. 09).

[11] Umweltbundesamt, Awareness of external costs - helps to improve environmental protection; The Methodological Convention for Estimates of Environmental Externalities: The Energy and Transport Sectors as Examples. In Energy, Ed. Umweltbundesamt: Dessau, Germany, (2007).

[12] hwp – hullmann willkomm & partner Website of hwp – hullmann, willkomm & partner Available online: http: /www. hwp-hullmann-willkomm. de/hwp/home. html (2014. 08. 10).

DOI: https://doi.org/10.1117/3.1002328.ch75

[13] Federal Ministry of Environment Nature Conservation and Nuclear Safety Website of the Federal Ministry of Environment, Nature Conservation and Nuclear Safety. Available online: http: /www. bmu. de/en/ (2013. 02. 20).

DOI: https://doi.org/10.1109/jphotov.2014.2359745