Application Scheme Organization of Arrival-Departure Line at Jinan West Railway Station

Article Preview

Abstract:

Running time of trains in a station is evaluation indicator. The safety and uniqueness of the use of departure lines and passengers’ convenience were considered as principles in the process of organization of arrival-departure line at Jinan West Railway Station. Besides, some factors were taken into consider, such as, the type of a station , train graph , the arrangement of route ,and the time and process of train technology. Use “Office Visio ” to organize the scheme of lines at Jinan West Railway Station. Then running time of trains in a station was carried on the appraisal. Result as follows: Each train takes 4.8 min traveling in the station in the average. The result is reasonable.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1065-1069)

Pages:

3362-3365

Citation:

Online since:

December 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Leo G. Kroon, H. Edwin Romeijn, Peter J. Zwaneveld. European Journal of Operational Research. Vol. 98 (1997), pp.485-498.

DOI: 10.1016/s0377-2217(95)00342-8

Google Scholar

[2] Malachy Carey and Sinead Carville. Transportation Research Part A. Vol. 37 (2003), p.195–224.

Google Scholar

[3] Roberto Cordone and Francesco Redaelli. Transportation Research Part B. Vol. 45 (2011) , p.430–446.

Google Scholar

[4] P. Vansteenwegen and D. Van Oudheusden. Transportation Research Part B, Vol. 41 (2007), p.478–492.

Google Scholar