Effectiveness Analysis of Promoting Deposition for Submerged Dike in Wenzhou Shoal

Article Preview

Abstract:

By means of natural condition、scour and silting evolution and mathematical models of wave, tidal flow and sediment, numerical study is carried out on deposit-promoting schemes in the reclamation project of Wenzhou shoal at Oujiang estuary in this paper. The main conclusions are:The scouring and silting reached equilibrium is 0.1~1.2 m in west side and 0.1~0.9 m in east side.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1065-1069)

Pages:

449-452

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Tianjin Research Institute for Water Transport Engineering. Tide current sediment mathematical silting-promotion plans in second phase reclamation of Wenzhou shoal model(2013).

Google Scholar

[2] Mengguo Li, Yong Yan, Miao Mai, Wendan Li. Tidal current and sediment problems related to the blocking of a branch in complicated bifurcated tidal estuary. Journal of Hydraulic Engineering(2010). in chinese.

Google Scholar

[3] Mengguo Li, Wendan Li. Study on Schemes for Stopping Flow in South Branch of Oujiang Estuasry. China Harbour Engineering(2009). in chinese.

Google Scholar

[4] Jingyun Zheng, Yongxian Chen, Mengguo Li. Numerical study of silting-promotion plans in second phase reclamation of Wenzhou shoal. Journal of Hydroelectric Engineering(2012). in chinese.

Google Scholar

[5] Juece Sun, Hongbo Zhao, Mengguo Li. Study on schemes between Niyu and Xiaoniyu in phase II deposit-promoting project of Wenzhou Shoal. Journal of Waterway and Harbor(2010) . in chinese.

Google Scholar

[6] MengguoLi. Numerical study on deposit-promoting schemes in the reclamation project of Wenzhou Shoal. Journal of Sediment Research(2005). . in chinese.

Google Scholar