Suspension-Diffusion Mathematical Model Calculation for Wenzhou Shoal in Construction Period
Abstract:
By means of natural condition and mathematical models of tidal flow and sediment, numerical study is carried out on suspension-diffusion in construction period after the reclamation project of Wenzhou shoal at Oujiang estuary in this paper. The main conclusions are: the suspension-diffusion is controlled by tidal current. The range of suspended sediment concentration more than 10mg/L is mostly in Wenzhou shoal area during filling sand construction, which is the continuous operation. Riprap construction is Instantaneous work; the range of scatter is limited.