The Research of the Governance of Instability Retaining Wall

Article Preview

Abstract:

According to retaining walls of joint construction buildings and office building of the mine of three yuan weizi town, outdoor pavement reinforcement of engineering practice, introduced the design parameters and construction process of the high-pressure jet grouting pile, soil nail wall and drilling grouting, the results showed that reinforcement scheme is reasonable and feasible, there is reference to other similar projects.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1065-1069)

Pages:

85-88

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Secretary tied firmly high pressure jet grouting pile in foundation uneven settlement construction accident Processing Technology, 2008, 31: 193-196.

Google Scholar

[2] Yu Jianlin, who opened China, Gong Xiaonan highway widening project soil under the hard shoulder Grouting China Journal of Highway Experimental Research, 2005, 18 (3): 27-31.

Google Scholar

[3] Wei Guang Yu, Ai-new high-pressure jet grouting method in the building of Underpinning Reinforcement of Earth Sciences and Environment, 2006, 28 (3): 66-69.

Google Scholar

[4] Wong Ling Cheng Zufeng soil nailing technique in loess slope support of Hebei University of Engineering (Natural Science Edition), 2007, 24 (4): 39-41.

Google Scholar