The Research of the Governance of Instability Retaining Wall
Abstract:
According to retaining walls of joint construction buildings and office building of the mine of three yuan weizi town, outdoor pavement reinforcement of engineering practice, introduced the design parameters and construction process of the high-pressure jet grouting pile, soil nail wall and drilling grouting, the results showed that reinforcement scheme is reasonable and feasible, there is reference to other similar projects.