Technology of Precasting and Installing for Integral Segment in Composite Girder Cable-Stayed Bridge

Article Preview

Abstract:

The main bridge of Quanzhou Bay Sea-Crossing Bridge is a composite girder cable-stayed bridge with span arrangement (70+130+400+130+70) m and with double pylongs,separated decks.It’s the first time to using the dry joints assembly in composite girder cable-stayed bridge,the technology of precasting and installing for integral segment is introduced.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1065-1069)

Pages:

976-983

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Gao Zong-yu, Zhang Qiang, Wang Ying-liang. Evolution of Desing of Cable-stayed Bridge with Composite Structure Main Girders [J]. Railway Investigation and Surveying, 2007, (S1): 49-53. in Chinese.

Google Scholar

[2] Zhang Jin-dou. Construction Technology of Super-structure of Main Bridge of Shanghai Nanpu Bridge [J]. China Civil Engineering Journal, 1992, (6): 43-48. in Chinese.

Google Scholar

[3] Nakamum S, Momiyama Y, Hosaka T, et al. New Technologies of Steel-concrete Composite Bridge[J]. Journal of Constructional Steel Research, 2002, 58(1): 99-130.

DOI: 10.1016/s0143-974x(01)00030-x

Google Scholar

[4] CCCC Highway Consultants CO., Ltd. Construction Draeing Desing of Quanzhou Bay Sea-crossing Bridge [Z]. Beijing: 2011. in Chinese.

Google Scholar