Experimental Research on Improvement of Railway Subgrade Loess Fills Using Lime in Northwest China

Article Preview

Abstract:

Theexperimental research on the double-track railway Lanzhou-Wuwei Railway (a partof Lanzhou-Xinjiang Railway) subgrade loess fills improved with lime revealsthe stiffness mechanism as well as the connection between stress and strainafter the lime treatment of loess. It also analyzes the influential propensityseveral factors have to the lime-improved-loess stiffness and comes up withinfluential patterns these factors have to the stiffness. The experimental resultplays an instructive role in the application of lime-improved-loess in sitespecific projects.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1079-1080)

Pages:

226-232

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Xianlong Wang. Chemical mechanism analysis on lime improvement for high speed railway loess filling. [J]. Geotechnical Engineering Technique, 2007, 21(6): 319-323.

Google Scholar

[2] Xiaolin Weng, Wei Wang, Baojian Liu. Model test on deformation characteristics of widening collapsible loess roadbed and dynamic compaction method treatment effect. [J] China Journal of Highway and Transport, 2011(2): 17-22.

Google Scholar

[3] Yingming Wang, Xiaolun Li. Introduction to treatment of collapsible loess subgrade for Shaanxi section of Zhengzhou-Xi'an passenger dedicated railway line. [J]. Rock and Soil Mechanics, 2009(s2): 283-286.

Google Scholar

[4] Zhiqiang Zhang, Xingyou Zhang, Guangyan Hu. Collapsible loess roadbed diseases types and causes. Subgrade Engineering, 2007(5): 160-162.

Google Scholar

[5] Shengxin Wang, Wenfeng Han, Wenwu Chen, Qingguo Liang. Application study of impact compaction technology to improvement of collapsible loess roadbed. [J]. Chinese Journal of Rock Mechanics and Engineering. 2003(s2): 2848-2852.

Google Scholar

[6] Zhengyu Qian. Main technical problems and engineering measures of railway in collapsible loess area. [J]. Chinese Railways. 2006, (2): 28-32.

Google Scholar

[7] TB10001-2004, Railway subgrade design specification. [S].

Google Scholar

[8] Railway construction letter.

Google Scholar

[2005] 285, Interim regulations on newly-built passenger-goods double services railway design with a speed of 200km/h[S].

Google Scholar

[9] Railway construction.

Google Scholar

[2003] 13, Interim regulations on Beijing-Shanghai high-speed railway design[S].

Google Scholar