Mortar Replacement Reinforcement Method for Existing Masonry Structures

Article Preview

Abstract:

For load-bearing capacity reducing of the walls of multi-storey masonry structure caused by the lower mortar strength and quality defects, the mortar replacement method was used to reinforce the perforated brick load-bearing walls. The strength of mortar used for replacing, the depth of replacement, construction methods and quality control have been studied. The reliability of this method is verified by testing in situ including axial compression test and double brick double-shear test for reinforced brick masonry. This method could be also used in reinforcement for the historical masonry buildings.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 133-134)

Pages:

977-981

Citation:

Online since:

October 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2010 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Building Engineering Code of China. Technical Specification for the Porous Bbrick Masonry Structure , JGJ137-(2001).

Google Scholar

[2] Housing Quality Detection Station of Tongji University Housing Quality Detection Report (2009)., (report number: 2009-08-17 ). November, 20th, (2009).

Google Scholar

[3] Housing Quality Detection Station of Shanghai Building Science and Research Institute. Report on In-situ Testing of Reinforced Walls (2009) , (report number: DF09-003 ), February, 16th, (2009).

Google Scholar

[4] National Standard of China. Code for Design of Masonry Structures, GB50003-(2001).

Google Scholar