A Joint Model of Production and Preventive Maintenance Plan

Abstract:

Article Preview

We integrated run-based preventive maintenance (PM) into the production plan at the tactical level. The production plan was based on the single level capacitated lot-sizing problem (CLSP). We assumed the system reliability should be kept above certain threshold value to ensure the feasibility of the production plan; the reliability would be affected only by system running. Thus, PM would be triggered by the reliability requirement and the accumulated running time. We established this relationship as a nonlinear integer constraint in the joint model. We also proposed a branch and bound algorithm using CPLEX to solve the model. Finally, a numerical example was given to illustrate the difference between run-based and time-based PM.

Info:

Periodical:

Advanced Materials Research (Volumes 156-157)

Edited by:

Jingtao Han, Zhengyi Jiang and Sihai Jiao

Pages:

18-23

DOI:

10.4028/www.scientific.net/AMR.156-157.18

Citation:

Z. Q. Lu and Y. J. Zhang, "A Joint Model of Production and Preventive Maintenance Plan", Advanced Materials Research, Vols. 156-157, pp. 18-23, 2011

Online since:

October 2010

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.