p.1
p.6
p.10
p.18
p.24
p.30
p.36
p.42
A Joint Model of Production and Preventive Maintenance Plan
Abstract:
We integrated run-based preventive maintenance (PM) into the production plan at the tactical level. The production plan was based on the single level capacitated lot-sizing problem (CLSP). We assumed the system reliability should be kept above certain threshold value to ensure the feasibility of the production plan; the reliability would be affected only by system running. Thus, PM would be triggered by the reliability requirement and the accumulated running time. We established this relationship as a nonlinear integer constraint in the joint model. We also proposed a branch and bound algorithm using CPLEX to solve the model. Finally, a numerical example was given to illustrate the difference between run-based and time-based PM.
Info:
Periodical:
Pages:
18-23
Citation:
Online since:
October 2010
Authors:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: