Abstract:

We integrated run-based preventive maintenance (PM) into the production plan at the tactical level. The production plan was based on the single level capacitated lot-sizing problem (CLSP). We assumed the system reliability should be kept above certain threshold value to ensure the feasibility of the production plan; the reliability would be affected only by system running. Thus, PM would be triggered by the reliability requirement and the accumulated running time. We established this relationship as a nonlinear integer constraint in the joint model. We also proposed a branch and bound algorithm using CPLEX to solve the model. Finally, a numerical example was given to illustrate the difference between run-based and time-based PM.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 156-157)

Pages:

18-23

Citation:

Online since:

October 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Raf Jans, Zeger Degraeve, Meta-heuristics for dynamic lot sizing A review and comparison of solution approaches, European Journal of Operational Research. 177 (2007) 1855–1875.

DOI: 10.1016/j.ejor.2005.12.008

Google Scholar

[2] B. Karimi, S.M.T. Fatemi Ghomi, J.M. Wilson, The capacitated lot sizing problem: a review of models and algorithms, Omega. 31 (2003) 65-378.

DOI: 10.1016/s0305-0483(03)00059-8

Google Scholar

[3] Daniel Quadt, Heinrich Kuhn, Capacitated lot-sizing with extensions: a review, 4OR: A Quarterly Journal of Operations Research. 6 (2008) 61-83.

DOI: 10.1007/s10288-007-0057-1

Google Scholar

[4] M.C. Eti, S.O.T. Ogaji, S.D. Probert, Reducing the cost of preventive maintenance (PM) through adopting a proactive reliability-focused culture, Applied Energy. 83 (2006) 235-1248.

DOI: 10.1016/j.apenergy.2006.01.002

Google Scholar

[5] Laura Swanson, Linking maintenance strategies to performance, Int. J. Production Economics. 70 (2001) 237-244.

Google Scholar

[6] Imad Alsyouf, Maintenance practices in Swedish industries Survey results, Int. J. Production Economics. 121(2009)212–223.

DOI: 10.1016/j.ijpe.2009.05.005

Google Scholar

[7] Larry Weinstein, Chen-Hua Chung, Integrating maintenance and production decisions in a hierarchical production planning environment, Computers & Operations Research. 26 (1999) 1059-1074.

DOI: 10.1016/s0305-0548(99)00022-2

Google Scholar

[8] E.H. Aghezzaf, M.A. Jamali, D. Ait-Kadi, An integrated production and preventive maintenance planning model, European Journal of Operational Research. 181 (2007) 679-685.

DOI: 10.1016/j.ejor.2006.06.032

Google Scholar