Based on the geological conditions of culvert of the South to North Water Transfer Project, lining temperature field of hydraulic tunnel for crack control is simulated by finite element software—ANSYS. According to numerical analysis results of lining temperature field, considering terrain condition, structural characteristics and climate, some engineering measures are taken during construction. Internal temperature of concrete is controlled effectively, concrete crack caused by temperature changes is solved successfully, and construction quality is assured. The difference of measuring data in-situ and calculating data is very small, which illustrate that calculated model is correct and parameters are reasonable. The results can act as reference for the design and construction of similar projects later.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 163-167)

Pages:

1505-1509

Citation:

Online since:

December 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chen shangmo: Heat transfer(Higher Education Press,Beijing 1990). (In Chinese).

Google Scholar

[2] Zhang Honhji: Heat conduction (Higher Education Press,Beijing 1992). (In Chinese).

Google Scholar

[3] Yu Changming: Heat conduction and numerical analysis(Tsinghua University Press,Beijing 2000). (In Chinese).

Google Scholar

[4] Rohsenow, W. M: Handbook of Heat Transfer (MCGraw-Hill Book Company, New York 1993).

Google Scholar

[5] Lobacz E F, Quinn W F. Thermal regime beneath building constructed on Permafrost. Proc 1st Int. Conf. Permafrost, Lafayette. Nat. Acad. Sciences Washington(1986).

Google Scholar

[6] Ladanyi B: Geotechnique for cold regions (MCGraw Hill Book Company, New York 1998).

Google Scholar