The Clever Use of Neutron-Axis of the Girder in the Stress Measurement of the Large Span PC Cable Stayed Bridge

Article Preview

Abstract:

As the stress measurement of interior concrete is hard in the construction control of the cable- stayed bridge, a new method fitted for stress measurement in large span PC concrete cable-stayed bridge is proposed in this paper. This method is based on the principle that the normal stress in neutron-axis of girder is only decided by the horizontal part of the cable force. First, the normal stress on the neutron-axis of girder is calculated by the measured cable force, and then the creep coefficient is identified, and finally the other stresses are worked out. This method has been applied to a large span PC cable-stayed bridge constructed in process with favourable results and thus proves its accuracy and efficiency.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 163-167)

Pages:

1696-1701

Citation:

Online since:

December 2010

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Carlson R.W., 1978. Performance tests on stress meters, Water power and Dam construction. 593pp.

Google Scholar

[2] Guo, L.Y., 1995. Measurements of Cable Forces, Temperatures and Stresses of the Second Changjiang River Bridge in Wuhan. Bridge Construction, (3): 44-53.

Google Scholar

[3] Zhou, L., Chen, Y.C., 1988. Creep and Shrinkage. China Railway Publishing House. 405pp.

Google Scholar

[4] Chu, H.N., 1989. The interior Observation Technology of the Concrete Dam. Water Resources and Electric Power Press. 207pp.

Google Scholar

[5] Wang, W.F., 2000. The construction monitoring of the PC Cable Stayed Bridge, phD thesis, South China University of Technology. 109pp.

Google Scholar