Performance Evaluation of Construction Materials Management in Expressway Project

Abstract:

Article Preview

Based on the characteristics of construction materials management of expressway projects, this paper analyzes the operation processes of the construction materials combined with operation management contents of all participants. Then it builds the index system of evaluation matrix, construction materials operation processes-participant. It establishes the AHP model of performance evaluation, and evaluation the performance from the three dimensions of operation phase, participants, and projects. Through the empirical study on LY expressway of Hunan Province, this paper drew up the performance evaluation conclusions which are in line with the project construction.

Info:

Periodical:

Advanced Materials Research (Volumes 179-180)

Edited by:

Garry Zhu

Pages:

475-481

DOI:

10.4028/www.scientific.net/AMR.179-180.475

Citation:

Y. Chen and J. J. Li, "Performance Evaluation of Construction Materials Management in Expressway Project", Advanced Materials Research, Vols. 179-180, pp. 475-481, 2011

Online since:

January 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.