p.449
p.456
p.463
p.470
p.476
p.481
p.487
p.495
p.500
Study the Equipment Based on Fast Flood Discharge
Abstract:
The design of the fast flood discharge equipment structure with displacement reached 0.5×104m3/h is given, which is based on the researchs of elimination methods for floods which happen in each kind of small reservoir in the flood season. This paper analyzes the equipment’s performance characteristic and application in the emergency on the spot. It indicates that its structure is reasonable and the performance is good.
Info:
Periodical:
Pages:
476-480
Citation:
Online since:
February 2011
Authors:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: