Study on the Application of Computer Synchronous Control in Lift-Slab Construction for Steel Frame Structures

Abstract:

Article Preview

By optimizing construction process, the laminated lift-slab method that means to lift two slabs one time upgraded from the traditional layer by layer lifting was proposed, the method in optimizing the construction process, shorten the construction period and improve the stability of group column has the significant advantages. Studied the application of computer synchronous control technology and solved the non-synchronization difficult problems in lifting slab, by controlling the lifting height error, which can reduce the board's destruction, reduce the burden uniformity of hoist, increase the stability of group column and speed up the construction progress. Therefore, the application of computer synchronous control technology in construction process has obvious economic and technical advantages.

Info:

Periodical:

Edited by:

Yuhang Yang, Xilong Qu, Yiping Luo and Aimin Yang

Pages:

45-49

DOI:

10.4028/www.scientific.net/AMR.216.45

Citation:

X. L. Cao and Z. F. Zhang, "Study on the Application of Computer Synchronous Control in Lift-Slab Construction for Steel Frame Structures", Advanced Materials Research, Vol. 216, pp. 45-49, 2011

Online since:

March 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.