The height from the bridge deck of 5th main pier to ground surface is about115m, and the depth from the top surface of pier cap to water surface is 65m. Reinforcement measures such as flaw detection by frogman, hole plugged, steel caisson placing, steel caisson modeling, high performance concrete seal cracks perimeter. Reinforcement show that, the effect of high-pressure water jet roughening and hole plugged is well; the steel caisson which weighs about 400t sinking stablely and reaching the intended design location; great liquidity, high performance concrete has good workability , 28d strength is above the design and specification demands, bridge static and dynamic tests meeting the design requirements. The research is important for bridge strengthening, and provides reference for the reinforcement design and construction of the same type bridge.
You might also be interested in these eBooks
Info:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
[1]
Design descriptions.National highway line 317(213) Dujiangyan to roads to Wenchuan two stage construction drawing E contract section design documents,(2002),pp.1-6
Google Scholar
[2]
Dajin Guo. Application of Bridge Strengthening Technology. Journal of Highway and Transportation Research and Development Vol.8 (2004),pp.72-73
Google Scholar
[3]
Jiankui Chen. NEW MIX DESIGN METHOD FOR HPC——OVERALL CALCULATION METHOD. journal of the Chinese Ceramic Society Vol.4 (2000),pp.194-198
Google Scholar
[4]
JTG/T J23-2008 Technical specifications for construction highway bridge strengthening[S].Beijing.China Communications Press P.6-8
Google Scholar
[5]
Caiwu Lan. Discussion & experiment on the plastic surface of concrete joint for bending intensity[J]. Concrete Vol.7 (2007),pp.14-16
Google Scholar
[6]
GB/T 18736-2002 High performance concrete with mineral admixtures[S].Beijing. Standards Press of China P.1-4
Google Scholar
[7]
DL/T 5100-1999 Technical specification for hydraulic concrete admixtures[S].Beijing. China Electric Power Press P.3-8
Google Scholar
[8]
Wenyuan Yang,Ben Xu. Bridge Construction Engineer Manual[J]. Beijing. China Communications press (1995),pp.370-372
Google Scholar
[9]
DL/T 5117-2000 Underwater concrete test code[S].Beijing. China Electric Power Press P.3-43
Google Scholar
[10]
JTJ 041-2000 Specification for highway bridge construction[S] P.42-4
Google Scholar
[11]
Pijun Hong. Construction Control Technique of Concrete Downward Pumped with High Fall [J].The World of Building Materials Vol.5 (2008),pp.28-32
Google Scholar
[12]
Bin Liu. Since the balance of suspected catheter shaft mixed vertical transportation of soil[J]. Water Science and Engineering Technology Vol.5 (2005),pp.11-12
Google Scholar
[13]
Wensheng Chai. Liugu River Bridge Pier Construction[J].Railway Standard Design Vol.1 (2001),pp.16-17
Google Scholar