Control Method on Main Girder Configuration of Self-Anchored Suspension Bridges Based on Long Segment Hoisting Method

Article Preview

Abstract:

Based on the object of self-anchored suspension bridge constructed with long segment hoist method, the load-carrying characteristics and construction technique which is different from other self-anchored suspension bridge is analyzed, and the method of calculation and control on steel box girder configuration during the construction course of long segment hoisted are proposed. For different calculation methods of girder configuration lifting, the influences of the three manners of pre-cambering for steel girders on the configuration and internal force of finished bridge are analyzed. The results show that inverse erection— forward erection—unstressed state synthetic method can guarantee the minimum deviation of steel girder configuration of finished bridge with the design, and it is not necessary to adjust the suspension cable force, and there is no change in main cable configuration and internal force.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Pages:

1540-1548

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Qin Shunquan. Bridge Construction Control - Theory And Practice Of Unstressed State Method[M].Beijing: People's Traffic Press,2007.

Google Scholar

[2] Zhou Xuhong, Wu Jun, Di Jin, China Civil Engineering Journal. Vol. 39(2) (2006) ,P.42-45,65.

Google Scholar

[3] Xiao Hanya, Yu Yannan, Gao Qingfeng: Journal of Zhejiang University.Vol. 38(11) (2004),P.1470-1473.

Google Scholar

[4] Qiu Wenliang, Zhang Zhe: Journal of Dalian University of Technology .Vol. 47(4) (2007),P.552-556.

Google Scholar

[5] Han Yan, Chen Zhengqing, Luo Shidong: Journal of Hunan University.Vol. 34(12)(2007) ,P.20-25.

Google Scholar

[6] Liu houjun: China Civil Engineering Journal, Vol.41(3)(2008),P.79-83.

Google Scholar

[7] Wang Zhicheng, Liu Changpeng,Shen Ruili: China Civil Engineering Journal .Vol. 41(12)(2008) ,P.61-65.

Google Scholar

[8] Zhang junping ,huang hai: Engineering Mechanics. Vol. 26 (supplement Ⅱ)(2009) ,P.160-167.

Google Scholar

[9] Wang Xiaoming, He Yaobei ,Shi Xuefei:Journal of Tongji University. Vol.38(5)(2010), P.625-631.

Google Scholar

[10] Li Chuanxi,Ke Hongjun,LILJ Hai-bo,Xia Guiyun: Engineering Mechanics. Vol. 27(5)(2010) ,P. 137-146.

Google Scholar