Heightening Design and Construction of the Reinforcement Concrete Chimney in Heated State

Article Preview

Abstract:

This paper introduced a project of reinforced concrete chimney with a height of 90 meters, which does not stop construction at nearly 200 degree Celsius, increased the height of the chimney with 10 meters. Reasonable structural measures were promoted to ensure the normal pouring of concrete chimneys. Compared with the normal condition, this measure is economical, low investment, feasible, etc. It provides far-reaching significance that increasing the height of the reinforced concrete chimney at the high temperature state.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Pages:

5610-5613

Citation:

Online since:

May 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] GB50009-2001: Load code for the design of building structure (China Architecture and Building Press, Beijing, 2006). (in Chinese)

Google Scholar

[2] GB50007-2002:Code for design of building (China Architecture and Building Press, Beijing, 2002). (in Chinese)

Google Scholar

[3] GB50010-2002: Code for design of concrete structures (China Architecture and Building Press, Beijing, 2002). (in Chinese)

Google Scholar

[4] GB50011-2001:Code for seismic design of buildings (China Architecture and Building Press, Beijing, 2008). (in Chinese)

Google Scholar

[5] GB50051-2002: Code for design of chimneys (China Architecture and Building Press, Beijing, 2002).(in Chinese)

Google Scholar