Heightening Design and Construction of the Reinforcement Concrete Chimney in Heated State

Abstract:

Article Preview

This paper introduced a project of reinforced concrete chimney with a height of 90 meters, which does not stop construction at nearly 200 degree Celsius, increased the height of the chimney with 10 meters. Reasonable structural measures were promoted to ensure the normal pouring of concrete chimneys. Compared with the normal condition, this measure is economical, low investment, feasible, etc. It provides far-reaching significance that increasing the height of the reinforced concrete chimney at the high temperature state.

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Edited by:

Chaohe Chen, Yong Huang and Guangfan Li

Pages:

5610-5613

DOI:

10.4028/www.scientific.net/AMR.243-249.5610

Citation:

H. B. Liu and M. Li, "Heightening Design and Construction of the Reinforcement Concrete Chimney in Heated State", Advanced Materials Research, Vols. 243-249, pp. 5610-5613, 2011

Online since:

May 2011

Authors:

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.