Research on Construction Risk Management System for Beijing Subway Suzhou Street Station

Abstract:

Article Preview

With Beijing subway Suzhou street station project, the composition of safety system for construction phase was studied. The safety responsibility of administrative department, technical branch, and operational department and construction personnel was clarified. The division and cooperative relationship were also analyzed. Meanwhile the construction techniques for shallow burial and dim excavation to improve safety performance for the whole project as well as surrounding environment under complicated city environment were discussed.

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Edited by:

Chaohe Chen, Yong Huang and Guangfan Li

Pages:

6352-6356

DOI:

10.4028/www.scientific.net/AMR.243-249.6352

Citation:

A. J. Zhang et al., "Research on Construction Risk Management System for Beijing Subway Suzhou Street Station", Advanced Materials Research, Vols. 243-249, pp. 6352-6356, 2011

Online since:

May 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.