[1]
Sun Cheng Shuang, Gu Guo Chang.Many Agent system frame [J] .Northeast forestry university college journal, 2006,34(5):81-82(In Chinese).
Google Scholar
[2]
Jiang Yu Lan.The item risk management develops the overview [J].Administration and management, 2007,258-259(In Chinese).
Google Scholar
[3]
Zhang Wen Jun.Constuct engineering item risk management theory analysis and the fulfillment [D].Southwest transportation university.2005(In Chinese).
Google Scholar
[4]
Zhang Jian She.The engineering item risk dynamic state that faces to process manages the method research [ D ] .University of Tienjin.2003(In Chinese).
Google Scholar
[5]
Guo Yong.The artificial nerve that the item risk analyzes network theory model and the application study [ D ] .North China electric power university.2005(In Chinese).
Google Scholar
[6]
Yin Xian Huan,Jia Yan.The design research that integrates system according to the risk management of the construction item whole life span period.[J] construct management modernization, 2008, 4:86-90(In Chinese).
Google Scholar
[7]
Jin De Min, Zheng Pi E.The theory of the engineering item whole life span risk management system and it the application study [J] .University college journal(social science version) in Tienjin, 2005,7(4):254-258(In Chinese).
Google Scholar
[8]
Liu Hai Feng. The large engineering item risk evaluates and the management study [D] .University of Tienjin. 2003 (In Chinese).
Google Scholar
[9]
Zeng Wei Hua. Engineering insurance and construction engineering carry out risk management [D] .Southwest transportation university. 2009(In Chinese).
Google Scholar
[10]
Chen Mei. The engineering constucts the item risk management system research [D] .Xian constructs science and technology university. (2003)
Google Scholar
[11]
Stephen Grey.Comparison of Three Approachesto Project Risk Man-agement [R]. PMI Melbourne Chapter. Broadleaf CapitalInternational Pty Ltd, 2000.
Google Scholar
[12]
Hall, Dave & Hullet, David. Universal Risk Project[R], Final Report. Feb (2002)
Google Scholar
[13]
H. Ping Tserng, Samuel Y.L. Yin, R.J. Dzeng, B. Wou, M.D. Tsa and W.Y.chen. A study of ontology-based risk management framework of construction projects through project life cycle[J], Automation in Construction,2009,18(7):994-1008
DOI: 10.1016/j.autcon.2009.05.005
Google Scholar
[14]
Thomas E Uher, A Ray Toakley. Risk management in the conceptual phase of a project [J]. International Journal of Project Management,17(3):161-169
DOI: 10.1016/s0263-7863(98)00024-6
Google Scholar