Discuss on Trust Level Evaluation Indexes of the Owner to the Controlling Based on Project Controlling Mode

Article Preview

Abstract:

This paper firstly introduces the concept of project controlling management and the application status in China, then analyzes the problems of project controlling management mode in application – the owner’s mistrust, explains the necessity of research on trust level evaluating indexes of the owner to the controlling, discusses the trust level evaluation indexes of the owner to the controlling, points out the next research direction..

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 250-253)

Pages:

1046-1049

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Guangshe JIA.Project controlling-new management mode of construction project[M].Shanghai: Tongji University Press,2003.( In Chinese)

Google Scholar

[2] Guangshe JIA,Guangbin Wang. Study on project controlling model for the large AEC project in China [J].China civil engineering journal,VOL36(3),7-10,2003. ( In Chinese)

Google Scholar

[3] Jing Pan.A Study on Trust Mechanism in Construction Projects Using Contract Theory[D],2008. ( In Chinese)

Google Scholar