Analysis on the Transmission Type of Programe Schedule Risk

Abstract:

Article Preview

Based on the program characteristics, putting the program schedule management as the starting point , this paper analyzes the characteristics and transmission type of the program schedule risk. Combined with the practice of the program schedule management, it provides the risk-control method to avoid the program schedule risk.

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Edited by:

Jingying Zhao

Pages:

3968-3971

DOI:

10.4028/www.scientific.net/AMR.255-260.3968

Citation:

H. D. Li and X. Q. Zhang, "Analysis on the Transmission Type of Programe Schedule Risk", Advanced Materials Research, Vols. 255-260, pp. 3968-3971, 2011

Online since:

May 2011

Export:

Price:

$35.00

[1] Chenghu. Project Management. China Building Industry Press, (2005).

[2] Li, Hongdi. Principle and Method of Feasibility Study. Chengdu University of Electronic Science and Technology Press, 2004; 2(7).

[3] He, Shoukui, Li, Hongdi. Large-scale Construction Program Risk Identification and Management Based On Organizations. Project Management Technology, 2009(2).

In order to see related information, you need to Login.