Study of Treatment Effect of Front Slope for Deng Cao-Tang Tunnel Outlet

Article Preview

Abstract:

Exampled with the project of front slope for Deng cao-tang tunnel outlet, the front slope is treated with prestressed anchorage cables. The reason of front slope cracking is analyzed. Moreover, the stress distribution of anchorage cables has been monitored so as to obtain the stress distribution in time. The results offer scientific basis with the treatment effect of front slope so that the safety of tunnel construction in ensured. The study has been great theoretical significance and practical value.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Pages:

4227-4231

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] DZ/T 0219-2006 Specification Of Design and Construction for Landslide Stabilization[S]. Beijing: China standard press,(2006).

Google Scholar

[2] JTG B01-2003 Technical Standard of Highway [S].

Google Scholar

[3] GB50026-2007 Code for engineering surveying [S].

Google Scholar

[4] Tan Han-hua, FU He-lin. Testing study of application of time domain reflectometry to highway slope monitoring. rock and soil mechanics, vol. 31(4), 2010, pp.1331-1336.

Google Scholar

[5] Han-dong Liu, Fei-peng Ruan, Guo-wei Li. k2 slope monitoring and stability analysis of yue-gan expressway. rock and soil mechanics, vol. 29(12)2008, pp.3365-3369.

Google Scholar

[6] Yong'an Zhang, Feng Li, Ou Jiang. analysis of prestress variation of cable in mudstone high slope reinforcement. chinese journal of rock mechanics and engineering, vol. 26(9)2007, pp.1888-1892.

Google Scholar