Research on Setting of Pre-Camber of Long-Span Continuous Rigid Frame Bridge with High Piers

Article Preview

Abstract:

In the design of continuous rigid frame bridge setting reasonable pre-camber can eliminate the impact of various loads on the linear in construction process, reduce shrinkage and creep in the process of post-operation, the late loss of pre-stressed, deformation produced by live load and so on ,resulting in deflection phenomenon. Based on the current specifications of the continuous rigid frame bridge camber setting methods, this thesis proposes the reasonable setting suggestions of pre-camber and sets examples to illustrate this.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Pages:

821-825

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] JTG D62-2004 Reinforced Concrete and Prestressed Concrete Highway Bridge Design Code [S].

Google Scholar

[2] JTG D60-2004 General Specification for Highway Bridge Design.

Google Scholar

[3] Liu Xuefa. Span continuous rigid frame bridge the application and development. Railway Standard Design, 1999 (1).

Google Scholar

[4] Huang Zengyan, Sun Yunxi. Prestressed concrete continuous beam bridge maintenance technology . Beijing: China Communications Press, 2008.

Google Scholar

[5] Ma Baolin. High pier span continuous rigid frame bridge. Beijing: China Communications Press, 2001.

Google Scholar

[6] Zhang Yongsui, Cao Shushang. Continuous rigid frame bridge linear control method . Foreign Highway, 2006, 26 (6): 84-86.

Google Scholar

[7] Xiang Zhongfu. Bridge construction technology . Beijing: China Communications Press, 2001.

Google Scholar