In this paper ,the axes of a three-span dumbbell-shaped steel tube concrete arch bridge was changed due to deviation in bridge piers, tie beam construction and steel tube production, thereby steel tube arch ring can not be closed, and suspender hole can not be aligned. The side-span hollow steel tubes were intercepted and adjusted for three times through calculation and analysis, therefore the structure stress is reasonable and achieved original design standards under the condition of not changing the original arch axes, and the bridge was successfully constructed, thereby providing reference for engineering staff.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Pages:

831-835

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] YE Qi-kui, ZHUANG, Chun-hua. "Linear Control Technology of Arched Rib of Arch Bridge of Steel Pipe Concrete"[J]. South China Harbour Engineering, Vol.106 (2007)pp.74-76

Google Scholar

[2] WANG Shu-mei ,QIAN Zhen-dong. "Mechanics Analysis of the Arch Rib of Concrete-filled-steel-tube Tie-Bar Arch Bridge".Journal of Transportation Engineering and Information.(2006),pp.41-45

Google Scholar

[3] LI Chuanxi, ZENG Zhaodong, DONG Chuangwen. "Stability Research of The Construction of the Dumbbell-shaped Arch Rib of CFST Arch Bridge". Highway Engineering. Vol.4 (2007):pp.142-145

Google Scholar

[4] GB50010-2002."Code for design of concrete structures". Beijing: Building industry publishing house of China(2002)

Google Scholar