Study on Improvement of Manufacturing Cycle Effectiveness of Apparel Vendor - Case Study of Order Scheduling and Batch Feeding manegement and Control

Article Preview

Abstract:

With the structural adjustment and industry transformation of the domestic apparel enterprises, as well as the rise of fast fashion, apparel manufacturing cycle time reduction and on time delivery rate have become performance indicators for brand enterprises to choose apparel vendors. In this paper, jeans processing factory is taken as a case study of apparel vendor. The improvement of production order scheduling and reasonable batch feeding process is analyzed to provide feasible programs for apparel vendors to achieve shorter manufacturing cycle, on time delivery and throughput increase.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

555-560

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] 2009-2010 China Garment Industry Development Report. Beijing: China Textile & Apparel Press, 2010.4:115.

Google Scholar

[2] Zhongfan Shui. Post-crisi-era: new trend·new strategy·new opportunity (Edition 1). Beijing: China Commercial Press, 2010.1.

Google Scholar

[3] Lihua Xiao, Nicheng Tong, Yongsheng Han. Scientific Operations: build brand-centric quick-responsed supply chain. Beijing: China Economics Publishing House, 2008.11.

Google Scholar

[4] Zhiping Zhao, Mingzhe Chen. Lean TOC. Shenzhen: Haitian Press, 2009:23,58.

Google Scholar

[5] Murakami Sato. Make Your Company Run: TOC management operation manual. Beijing University Press, 2004.

Google Scholar

[6] Yixiong Yang. Apparel Production Management. Shanghai: Donghua University Press, 2005:186.

Google Scholar

[7] Eli Goldratt. Critical Chain. Beijing: Publishing House of Electronics Industry, 2009:122-138.

Google Scholar

[8] Jun-Huei Lee, Jia-Ging Chang, Chih-Hung Tsai, Rong-Kwei Li.Research on enhancement of TOC Simplified Drum-Buffer-Rope system using novel generic procedures[J]. Expert Systems with Applications, 2010(37): 3747- 3754.

DOI: 10.1016/j.eswa.2009.11.049

Google Scholar

[9] Tao Tao, Shilong Xiang. The application of TOC in furniture production[J]. China Forest Products Industry, 2010(1):46-50.

Google Scholar