Optimization and Application of High Production and High Efficiency Mining Parameters of Fully Mechanized Caving Face

Article Preview

Abstract:

The size of the fully mechanized caving face is optimized by theoretical analysis and the dip length of the face is determined as 260m. With the method of numerical simulation, the reasonable cutting height of the face is determined as 3.5m and the caving method is determined as one round caving in order. The physical simulation is used to analyze the caving effects under different drawing intervals and the reasonable drawing interval is determined as 0.8m. The coal recovery is improved by 3.43% after the parameters are applied in field and the goal of high production and high efficiency of the mine has been achieved.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 361-363)

Pages:

198-203

Citation:

Online since:

October 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhongping Guo: New Technology of the Coal Mining (China University of Mining and Tech Press, China 1997). (In Chinese)

Google Scholar

[2] Wenxue Jin and Zhongming Jin: submitted to Journal of Taiyuan University of Technology. Vol. 31 (2000), pp.508-510 (In Chinese)

Google Scholar

[3] Ziyu Song and Songzhu Cui: Coal Mining. Vol. 12 (2007), pp.39-40 (In Chinese)

Google Scholar

[4] Xianwen Geng: Coal Technology. Vol. 20 (2001), pp.20-21 (In Chinese)

Google Scholar

[5] Kaizhi Zhang, Jinquan Jiang and Shiliang Wu: Journal of China Coal Society. Vol. 28 (2003), pp.246-249 (In Chinese)

Google Scholar