Quality Control over Construction Process of Petrochemicals Project

Article Preview

Abstract:

Today’s construction quality signifies a lot to the tomorrow’s rate of return on investment for the project. The quality control over construction process shall be implemented following the principle of “well planning beforehand, tight control during the process and timely inspection after completion, and emphasis to be laid on the control of key positions”. To ensure to achieve the goals of building the project into a high quality project at national level in China, quality plan and detailed rules for implementation of supervision should be developed. Quality control over working process during the construction is very important too.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 368-373)

Pages:

2161-2164

Citation:

Online since:

October 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shizhao Ding: Engineering project management (China Architecture & Building Press, Beijing 2011), in Chinese.

Google Scholar

[2] Qian Shi and Wenfa Hu: Project quality management (Tongji University press, Shanghai 2006), in Chinese.

Google Scholar

[3] Yuezhi Mei: Municipal Engineering Quality Supervision manual (China Architecture & Building Press, Beijing 2006), in Chinese.

Google Scholar

[4] R.J. Gray: International Journal of Project Management Vol. 15(1997), p.5–9.

Google Scholar

[5] Tao Yu: Working procedure quality control theory and application (Economic Management Press, Beijing 2008), in Chinese.

Google Scholar