Parameter Optimization of Kanban Production System for an Engine Assembly Workshop Based on Witness

Article Preview

Abstract:

To kanban production system of a engine assembly shop as the empirical study, the simulation model of the Kanban production system about designing, running and optimizing are elaborated, which is on the basis of understanding basic theory of Kanban production system. More importantly, using optimization, researched further the effects of different value of safety factor and coefficient of variation of Kanban production system on the impact of the results, and determined the optimal combined scheme.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

252-255

Citation:

Online since:

November 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Qi E rshi. Fang Qingguan. Logistics Engineering. Beijing: China Machine Press(2006)

Google Scholar

[2] Wang Yachao. Ma Hanwu. Modeling and Simulation for Production Logistics System. Beijing:China Science Press(2006)

Google Scholar

[3] Monden. Y. How Toyota shortened supply lot production time, waiting time, and conveyance time. J. Industrial Engineering. vol 13 pp.22-29(1981)

Google Scholar

[4] Li Gang. Peng Jinmei & Deng Xiu. Research progresses and prospection of Just-in-time. J.Industrial Engineering and Management. vol 14 pp.18-20(1997)

Google Scholar

[5] Wu Yuanyuan. Yu Haiming. Wu Long. Simulating and optimizing of kanban production system based on Witness. J.Group Technology &Production Modernization.vol 25pp9-12(2008)

Google Scholar

[6] Moore, Laurence J, Clayton, Edward R. GERT modeling and simulation: Fundamentals and applicators. New York: Petrocelli-Charter(1976)

Google Scholar

[7] Y. Sugimori, K. Kusunoki, F.Cho, S. Uchikawa. Toyota production system and kanban system-Materialization of just-in-time respect-for-human systems. International Journal of Production Research. vol 15pp553-564(1977)

DOI: 10.1080/00207547708943149

Google Scholar

[8] Gao Juhong. Bai Mapeng & Ershi Qi. Research of integration schemes for packing production line implemented Just-in-time .J.Industrial Engineering. 13 pp.49-53(2004)

Google Scholar