Hoist Safety Risk Assessment Model Research

Article Preview

Abstract:

Considering the various factors which influenced the safety of hoist system, and the general objective which was the failure probability of hoist system, it established the safety risk assessment model for hoist system. Then it used the time-varying effect to forecast the failure probability and crash damage of hoist system. It constructed the evaluation index system, and used the AHP method, the fuzzy mathematics method and the method of expert advice on weight distribution at various levels. Based on the evaluation and analysis of Zhuzhuang reservoir projects on the gate crane, it proved that the safety risk assessment model for hoist system was scientific, safety and reliability.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 383-390)

Pages:

1225-1230

Citation:

Online since:

November 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ye Xiang, Fault tree analysis method for reliability of hydraulic steel structures, Journal of Hohai University: Natural Sciences, vol 32 No. 6, p.665–668, (2004).

Google Scholar

[2] Wang Bing, Li Jun, Hydropower project evaluation software development of steel structure, Water Resources and Hydropower Engineering, vol 3 No. 03, p.5–8, (1994).

Google Scholar

[3] Yang Guangming, Based on artificial intelligence safety evaluation of a hydraulic metal structure system, preliminary design, Journal of Hohai University, vol. 34, No. 6, p.645–649, (2006).

Google Scholar

[4] Yang Guangming, Hydraulic metal structure design and safety assessment system, Nanjing, Hohai University, (2005).

Google Scholar

[5] Li Lei, Wang Renzhong, Cheng Jinbao, Dam Risk Assessment and Risk Management, Beijing, China, Water Conservancy and Hydropower Press, p.34–34, p.98–104, (2006).

Google Scholar

[6] He Xianfeng, Dam risk analysis system and operation, Nanjing, Hohai University, (2008).

Google Scholar

[7] Su Huaizhi, Hu Jiang, Wu Zhongru, Based on the time-varying risk assessment model dam life-span, the dam safety monitoring technology information network information technology conference 2008 the dam safety monitoring technology development and application of proceedings, Suzhou, p.262–61, (2008).

DOI: 10.1177/1475921711419993

Google Scholar

[8] Yang Bo, Dai Guoxin, Chen Changhai, Steel structure engineering resistance and time-varying model validation, Journal of Chongqing University of Architecture, vol. 30, No. 5, p.95–99, (2008).

Google Scholar

[9] Yang Guangming, Qin Zhansheng, Xia Shifeng, Zhuzhuang reservoir hydraulic metal structure safety inspection report, Nanjing, Water Hydraulic Metal Structure Safety Monitoring Center, (2005).

Google Scholar

[10] Water Conservancy and Hydropower Engineering Metal Structure Standards, SL 226–98.

Google Scholar

[11] Industrial enterprises in the financial system, Annex, 1, (1992).

Google Scholar

[12] Water Conservancy and Hydropower Engineering Design Specification Hoist, SL41–93.

Google Scholar